COMMERCE BUSINESS DAILY ISSUE OF APRIL 17,1998 PSA#2076Fleet and Industrial Supply Center, Norfolk Washington Detachment 901
M.Street, S.E. Bldg. 200 4th Flr., Washington Navy Yard, Washington, DC
203 10 -- WEAPONS LAYING MINES (ORDNANCE) SOL N00600-98-R-1938 DUE 060698
POC No solicitation is available for this procurement. For additional
information, contact Ayo H. Johnson, code 02W1.1F, (202) 433-2970;
Contracting Officer, Lisa Murtha, (202) 685-1864. The Fleet and
Industrial Supply Center, Norfolk, Detachment Washington, intends to
negotiate a sole-source contract for the manufacturing, testing,
packaging, and shipping of QUICKSTRIKE components in accordance with
Drawings and Weapons Specifications provided by COASTSYSTA for the
Naval Surface Warfare Center, Coastal Systems Station (COASTSYSTA) in
Panama City Florida. Delivery will be FOB Origin. We anticipate
negotiating this requirement with Frequency Engineering Laboratories,
Inc in accordance with FAR 6.302-1. The contractor will provide all
services necessary to accomplish this work at contractor operated
facilities. This is anticipated to be a Firm-Fixed Price -- Supply,
IDIQ contract for a base year period of 12 months with four (4)
one-year options. A 10% minimum guarantee for each lot is anticipated.
No solicitation is available for this requirement. The total estimated
purchase quantities are as follows: Lot I, Kit Refurbishing -- 198,
Spacers -- 100, Float Container -- 50, Float Assembly -- 50, Safety
Device -- 50, Delay Element -- 70, Spring 50, Pad -- 50. Lot II, Kit
Refurbishing -- 100, Lot III, Kit Refurbishing -- 80, Spacers -- 100,
Float Container -- 50, Float Assembly -- 50, Safety Device -- 50, Delay
Element -- 50, Spring 50, Pad -- 50. Lot IV, Kit Refurbishing -- 94.
Lot V -- Kit Refurbishing -- 162, Spacers -- 100, Float Container --
50, Float Assembly -- 50, Safety Device -- 50, Delay Element -- 50,
Spring 50, Pad -- 50. The delivery lead times are as follows: Kit
Refurbishing -- 620 days, Spacers -- 180 days, Float Container -- 190
days, Float Assembly -- 190 days, Safety Device -- 180 days, Delay
Element -- 180 days, Spring 180 days, Pad -- 180 days. A Justification
and Approval For Other Than Full And Open Competition in accordance
with FAR 6.302-1 has been prepared. *See Note 22* (0105) Loren Data Corp. http://www.ld.com (SYN# 0135 19980417\10-0002.SOL)