|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 28,1998 PSA#2083U.S. Army Corps Of Engineers, Fort Worth District, P.O. Box 17300, 819
Taylor Street, Attn: CESWF-CT, Fort Worth, TX 76102-0300 Z -- INDEFINITE QUANTITY CONSTRUCTION CONTRACT -- STILLING BASIN,
CANYON LAKE, TX SOL DACW63-98-B-0030 DUE 061698 POC Beverly Johnson,
Contract Specialist, 817/978-3576 WEB: Corps of Engineers, Fort Worth
District, Contracting Division, http://ebs.swf.usace.army.mil. E-MAIL:
Beverly Johnson, Contract Specialist,
beverly.johnson@SWF01.usace.army.mil. Contractor shall furnish all
equipment, personnel, supplies, fuel, maintenance, and supervision to
perform construction activities for removal and replacement of stilling
basin inclusive of the baffle blocks at Canyon Lake, TX. Contract will
include care of underground infrastructure and care of water.
Estimated Cost Range: $250,000.00 to $500,000.00. Bid sets are
available at $20.00 for half-size drawings. No full-size drawings
available. Requests by mail must include payment in the applicable
amount by company check or money order made payable to Finance &
Accounting Officer, USAED, FTW, and mailed to USACE, ATTN: Room 1A01,
819 Taylor Street, P.O. Box 17300, Fort Worth, Texas 76102-0300.
Request in person may be paid in cash. NO EXPRESS MAIL PROCEDURES WILL
BE UTILIZED ON INITIAL MAILING OF PLANS AND SPECS. No refund will be
made and materials need not be returned. If project is canceled or no
award is made, cost of plans and specifications will be refunded only
upon written request. Solicitation to be issued on or about 12 May 1998
with bid opening on or about 16 June 1998. Bids from all qualified
business concerns are solicited. SIC code for this project is 1629 and
the size standard is $17 million. (0114) Loren Data Corp. http://www.ld.com (SYN# 0107 19980428\Z-0004.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|