|
COMMERCE BUSINESS DAILY ISSUE OF MAY 13,1998 PSA#2094Aeronautical Systems Center (ASC/YHK), 102 W D Avenue, Ste 300 Eglin
AFB, FL 32542-6807 10 -- MULTIPLE CARRIAGE "SMART" BOMB RACK PRODUCTION PROGRAM POC Mr.
Mack Kirkland, Contracting Officer, Major Scott Pigeon, Program Manager
(850) 882-5780 Ext 2083 SYSTEM DESCRIPTION: The BRU-55 allows carriage
of two smart weapons (up to 1000 lb class) on a single aircraft
station. BRU-55 weapons currently consist of JSOW, 1000 lb JDAM, and
WCMD. Future expansion is possible to other MIL-STD-1760 aircraft and
weapons. The Air Force's BRU-55A/A consists of the BRU-33 strongback
(GFE from the Navy), 2 x BRU-46 ejector units, and electronics (being
developed under the EMD contract). The BRU-55 is 70" long, 26" wide,
and weighs 240 pounds. Its aircraft interface is 30" lugs and single --
1760 umbilical. Its weapons interface is 14" lugs and one -- 1760
umbilical each. PROGRAM STATUS: The BRU-55 program is currently in
development under an EMD contract. Critical Design review took place on
18 Nov 97 with the initial qualification testing beginning in January
1998. The electronics being added to the rack allow the F-16 to address
two 1,000 pound class smart weapons per station, doubling F-16 smart
weapon capability. Minimal logistics footprint by using existing
hardware with the new "Smarts". Air combat Command's maintenance
philosophy will be contractor logistics supported. Flight testing
begins in August 1998. The BRU-55 acquisition strategy is in
development. Draft RFP is planned for release late FY 98 with
subsequent award 31 Mar 99. The BRU-55 program has been designated as
a total Small Business Set-aside. (0131) Loren Data Corp. http://www.ld.com (SYN# 0142 19980513\10-0002.SOL)
10 - Weapons Index Page
|
|