Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 13,1998 PSA#2094

Department of Transportation, Federal Aviation Admin. (FAA), Procurement Branch, AWP-55, P.O. Box 92007, WWPC., Los Angeles, CA 90009-2007

C -- A & E DESIGN SERVICE FOR NEW AIR TRAFFIC CONTROL TOWER, GRAND CANYON NATIONAL PARK AIRPORT, GRAND CANYON, AZ SOL DTFA08-98-R-03217 POC Michelle Turner, Contracting Officer or James Travers, Contractor Rep. (310) 725-7546 WEB: Chick Here to Download a copy of Synopsis, http://www.awp.faa.gov/organ/logist.htm. E-MAIL: Click Here to Contact Contractor Rep. via e-mail, james.travers@faa.dot.gov. 1. CONTRACT INFORMATION: Architectural and Engineering services are required for environmental assessment, surveying, site investigation, engineering studies, project definition phase, preliminary and final design, and construction phase services (option) for the subject project. This announcement is open to all firms regarless of size. A firm-fixed price contract will be negotiated. The contract is anticipated to be awarded in August 98 and complete by October 99. PROJECT INFORMATION: Approximately 95-ft tall tower with a 525-sq. ft. Cab and adjoining 3000 sq. ft. Base Building. The tower will include a breakroom, toilet facilities, as well as mechanical and electronic support equipment within the floors below the cab. The Base Building will house the administrative support facilities, mechanical and electronic equipment and emergency backup power equipment. The project shall include support for the transition of related FAA facility equipment control to the new tower. The estimated construction cost is $5,000,000 to $10,000,000. SELECTION CRITERIA: The selection criteria are listed below in descending order of importance (first by major criterion and then by each sub-criterion). Criteria a-e are primary. Criteria f-g are secondary and will only be used as "tie-breakers" among technically equal firms. a. Specialized experience and technical competence in: (1) Structural design of high-rise facilities per the 1997 Uniform Building Code (UBC), particularly the Grand Canyon, AZ area. (2) Design of FAA Airport Traffic Control Towers. (3) Design of fire protection systems (4) HVAC designs for high rise facilities. (5) Power studies and short circuit analysis for critical facilities. (6) Stormwater management and erosion control. (7) Computer aided design and drafting, including 3-dimensional analysis. (8) Computer aided cost estimating. (9) Computer aided project managment. (10) Producing quality designs based on evaluation of a firm's design quality management plan. b. California energy standards (Title 24), County of Coconino Plan Check procedures and permit requirements, Arizona Department of Transportation procedures and permit requirements, United States Forest Service procedures and permit requirements, Federal Aviation Administration regulations including FAA Orders pertaining to construction. (0128)

Loren Data Corp. http://www.ld.com (SYN# 0016 19980513\C-0003.SOL)


C - Architect and Engineering Services - Construction Index Page