|
COMMERCE BUSINESS DAILY ISSUE OF MAY 15,1998 PSA#2096U.S. Small Business Administration, Office of Procurement and Grants
Management, 409 3rd Street, SUITE 5000,5th Floor, Washington, D.C.
20416 R -- PRO-NET OUTREACH SOL SBAHQ-98-Q-0051 DUE 052698 POC Diane Butler
(202) 205-7049 This is a 100% Small Business Set Aside. Background
Information The Contractor will design and conduct an aggressive
outreach program with the advice, guidiance, and approval of the COTR.
This is the formal process by which the size of the data base is
increased. This is accomplished by obtaining names and address files
from public and priviate sector organizations and using the information
to make mass mailings to firms within targeted populations. Successful
offeror must have their own mail room capability. Sources will be
identified, primarily, by the contractor based on their sutiability,
availability and cost. SBA may also locate and or recommend potential
source files. Upon approval of the COTR, the contractor shall obtain
and process the selected firm(s) according to the procedures outlined
below. Cost for procurement of these files, will be charged back to the
SBA on the bill covering the month the liability was actually incurred.
The total cost for such files shall not exceed limits established by
the COTR. A mailing consist of PRO-NET marketing materials accompanied
by a letter explaining the program. These are enclosed in an SBA
envelope. All materials are provided by SBA. The outreach program is
expected to produce up to 100,000 mailings per month. Inputswill be
secured from sources primarily in the form of machine readable magnetic
tape, howvere, some key entry work may be required. All tapes shall
become the property of SBA and shall be provided by the contractor to
the COTR on a monthly basis in a form and in a manner specified by the
COTR. This effort will allow SBA to obtain and process sutiable
address files and allow for measuring the effectiveness of the outreach
program. This assist SBA in determining how many firms receiving the
outreach package actually registered. Contractors Responsibilities --
Specifically, the contractor shall: Receive and control name and
address inputs as described above. Hard copy name and address listings
will be key-entered for processing whichinclude keying and
verification. Separate pricing is required for: A. Magnetic Processing
__ __ __ __ __ B. Key-Entered Processing Techniques __ __ __ __ ___
Check new inputs against the PRO-NET data base and against the list of
firms which have received outreach mailings within the past twelve
months. Mailing labels will be generated for non-duplicated firms. All
addresses will be normalized and sorted using "Group One Software" or
its equivalent. Mail outreach package within 45 days of receipt of
inputs. Produce a monthly status report (NSP). (0132) Loren Data Corp. http://www.ld.com (SYN# 0063 19980515\R-0005.SOL)
R - Professional, Administrative and Management Support Services Index Page
|
|