|
COMMERCE BUSINESS DAILY ISSUE OF MAY 18,1998 PSA#2097National Park Service, Padre Island National Seashore, 9405 South Padre
Island Drive, Corpus Christi, TX 78418-5597 F -- PERFORM ENVIRONMENTAL AND PHYSICAL SURVEY OF BIRD ISLAND BASIN
AND BOAT CHANNEL SOL 1443RQ749080006 DUE 061998 POC Anita McDaniel
512-937-2621 EXT. 27 E-MAIL: anita_mcdaniel@nps.gov,
anita_mcdaniel@fed.gov. Bird Island Basin boat channel is approximately
3400 feet long and varies from 100 feet to 150 feet wide. Collection of
existing data such as aerial photographs, recent surveys,natutical
charts, etc. Field work to describe existing conditions which will
consist of placing transects for surveying, measuring for sediment
depth,sampling surface soil type,taking core samples, and sounding
channel to identify high spots. Prepare report of findings. If dredging
of channel is needed, there would be a requirement for a disposal site
evaluation, a mitigation plan, and an environmental assessment report.
Assist in all applications, permits and drawings as required. (0134) Loren Data Corp. http://www.ld.com (SYN# 0029 19980518\F-0007.SOL)
F - Natural Resources and Conservation Services Index Page
|
|