COMMERCE BUSINESS DAILY ISSUE OF JUNE 9,1998 PSA#2112U.S. Department of Labor, ETA, Division of Acquisition & Assistance,
200 Constitution Ave., NW, Room S-4203, Washington, DC 20210 Y -- PY '96 -- VOCATIONAL SHOP ADDITION & HVAC REHABILITATION AT THE
BATESVILLE JOB CORPS CENTER, BATESVILLE, MISSISSIPPI SOL
IFB-98-DAA-37-JC DUE 081998 POC William Nixon, AIA or Dan Garrigan, AIA
(901) 278-6868 or Monica Gloster, Contract Specialist, (202) 219-8706
WEB: IFB-98-DAA-37-JC, http://www.cbdnet.access.gpo.gov. E-MAIL:
IFB-98-DAA-37-JC, glosterm@doleta.gov. The work to be performed under
this project involves the construction of a 3,296 SF addition to
Building No. 3, Classroom, which includes an automotive repair shop,
two classrooms, toilet rough-in, office, storage, parking and paving.
Additional work in Building No. 3 includes the conversion of the
existing automotive shop into a paint shop and the rehabilitation of
the existing masonry and carpentry shops. In Building No. 14,
Multipurpose, the work consists of the installation ofa ducted return
air system which includes a new ceiling, and the patching, repair and
painting of existing walls. Alternate No. 1, includes paving and
grading at area adjacent to Building No. 2, Cafeteria. Alternate No. 2,
includes paving, drainage and grading at area adjacent to Building No.
7, Warehouse, and Alternate No. 3, includes the fit out of the new
toilet room in Building No. 3 at the Batesville Job Corps Center
located in Batesville, Mississippi. Construction time from NTP to
substantial completion for the work is 32 weeks. The estimated cost
range of construction is between $250,000 to $500,000. Plans and
specifications will be available on or about June 29, 1998 ONLY from
the office of Askew Nixon Ferguson Architects, Inc., 1500 Union Avenue,
Memphis, Tennessee 38104. Contact William Nixon or Dan Garrigan at
(901) 278-6868 for additional information regarding this project.
Collect calls will not be accepted. It is emphasized that requests for
plans and specifications shall be directed to the A/E firm listed
above to ensure proper handling of requests. All requests must be in
writing. Requests will be answered on a first-come, first-serve basis
until supplies are exhausted. For For requests made after the supply is
exhausted, the Contracting Officer may determine whether payment of a
fee is warranted. The non-refundable fee shall not exceed the actual
cost of duplication of the IFB documents, plus COD charges. A Pre-bid
walk-through is scheduled for July 14, 1998, at 10:00 a.m. local time.
Bid opening date is August 19, 1998, at 2:00 p.m. local time. This
acquisition is a 100% Small Business Set-Aside. The SIC Code is 1542.
The size standard is $17.0 million. (0156) Loren Data Corp. http://www.ld.com (SYN# 0102 19980609\Y-0010.SOL)