|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 10,1998 PSA#2113CG, MCAS Cherry Point, Facilities, OIC NAVFAC Contracts, Building 163,
PSC Box 8006, Cherry Point, NC 28533 Z -- REPLACE STEAM AND CONDENSATE LINES, BEQ AREA, MARINE CORPS AIR
STATION, CHERRY POINT, NORTH CAROLINA SOL N62470-97-B-6948 DUE 080498
POC Susan Perkins, Procurement Technician (919)466-5930 The work
includes replacement of FRP condensate piping and in some cases both
condensate and steam piping. Specifically, remove existing FRP and
replace with new steel condensate piping, remove and replace a limited
amount of high pressure steam (HPS) piping, and provide cathodic
protection tie-in of new steel pipe to existing impressed current
system. Some removal of asbestos is required. Demolish and modify
manholes as indicated in the contract documents. Replace and/or repair
pavement, curbing, and sidewalks where condensate and steam piping
cross. Estimated Cost Range: Between $500,000 and $1,000,000. There is
a $25.00 non refundable charge per set for plans and specifications.
Make check or money order payable to Disbursing Officer, DFAS Kansas
City Center, but mail to the Cherry Point address. Solicitation Release
Date: 01 July 1998. This procurement is unrestricted. (0159) Loren Data Corp. http://www.ld.com (SYN# 0141 19980610\Z-0028.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|