|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 10,1998 PSA#2113DIRECTORATE OF CONTRACTING, P O BOX 2248, FT RILEY KS 66442-0248 Z -- OZONE DEPLETING COMPOUNDS (ODC) PHASEOUT PROJECT -- PHASE I, FT.
RILEY, KS SOL DAKF19-98-B-0009 DUE 053098 POC Contracting Officer
David E. Wild (785) 239-0485, Contract Specialist LANNIE PENDER (785)
239-0460 e-mail, penderl@riley-emh1.army.mil (Site Code DAKF19) The
following project which was issued on 11 May 98 has been extended
indefinitely: Replace existing Halon fire Protection systems. The work
requires the replacement of Ozone Depleting Compound (ODC) fire
suppression systems with non ODC fire suppression systems in Computer
Rooms, Flight Simulator Rooms and Communication Buildings. The required
work consists of but is not limited to furnishing all plant, labor,
equipment, materials, transportation, and prepare, maintain and submit
as built drawings. Proposed contract will be a firm fixed price
contract with Base Items (funded) and three option items (unfunded at
this time). Estimated cost of this project is between $500,000 and $1
Mil. The procurement is unrestricted. The Standard Industrial Code
(SIC) is 1711 and the small business size standard is $7. Mil. When
requesting this solicitation package include your size standard, i.e.,
large business, small business, small disadvantaged business, tax ID
number and Commercial Entity Code (CAGE) if known. NO TELEPHONE CALLS,
PLEASE. E-mail is accepted at the above address and FAX requests at
(785) 239-8983. When requesting package provide complete company name,
complete company address, phone number and FAX number. All responsible
sources may submit a bid with will be considered by the agency. (0159) Loren Data Corp. http://www.ld.com (SYN# 0148 19980610\Z-0035.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|