|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 15,1998 PSA#2116U.S. Special Operations Command, Attn: AMSAM-AR-Z-A-K, Bldg 401, Lee
Blvd., Fort Eustis, VA 23604-5577 16 -- TEARDOWN & INSPECT AND REPAIR/OVERHAUL OF ALLISON 250-C30(H) GAS
TURBINES ENGINE SOL USZA95-98-R-0027 DUE 073198 POC Laura E. Harris,
Contract Specialist, (757) 878-5223 Ext: 247, or Richard J. Cooney,
Contracting Officer, (757) 878-5223 Ext: 251, AMSAM-AR-Z-A-K E-MAIL:
rcooney@tapo.eustis.army.mil, lharris@tapo.eustis.army.mil. The
proposed procurement is for teardown & inspection and repair/overhaul
of Allison 250-C30(H) Gas Turbine Engines as well as these accessories
and components : (accessories) -- governor, fuel nozzle, bleed valve,
fuel control, C-30 panel control, turbine, and (components &
accessories) -- engine teardown & inspection, accessory teardown &
inspection, compressor teardown & inspection, fuel & oil for final
testing of engines, fuel & oil for final testing of compressors, labor
for repair efforts, parts required for repairs, spare parts not
required for repairs, evaluation reports engine, compressor or
accessory, pretest of engine, pretest of accessory, pretest of
compressor as well as a on-site Field Service Representative (FSR) in
support of the Allison C30H Engine installed on BOEING/MDHC 500 Series
Aircraft which have been modified into MH-6/AH-6 Special Operations
Configurations having a thorough knowledge of C30H Engine manufacturing
processes, repair procedures, and components parts manufactured by
Allison and its subcontractors or vendors. The primary uses of the FSR
shall be to provide advisory service for updating the skills of
Department of the Army (DA) maintenance personnel and to serve as a
liaison between Allison and the customer organization. Contractor shall
provide any required C30H Engine Aviation Unit Maintenance/Aviation
Intermediate Maintenance (AVUM/AVIM) level spare and repair parts. Type
of contract is anticipated to be an Indifinite Delivey Indefinite
Quantity (IDIQ) for a three year period. Period of Performance will
commence 01 October 1998. No split award will be made. All contractors
must be Allison approved maintenance centers. The proposed contract
action is for supplies and services for which the Government does not
own specifications and drawings to permit full and open competition.
Approved sources are Allison Engine Company Authorized Mainenance
Centers. Firms that recognize and can produce the required items
described above are encouragedto identify themselves to the Contracting
Officer and provide supporting evidence to the Contracting Officer
which will permit their participation in current or future
solicitations. See Note(s): 22 (0162) Loren Data Corp. http://www.ld.com (SYN# 0219 19980615\16-0011.SOL)
16 - Aircraft Components and Accessories Index Page
|
|