|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 15,1998 PSA#2116Commander, U.S. Army Aviation and Missile Command, Acquisition Center,
Research Development and Engineering Center, Redstone Arsenal, AL
35898-5000 A -- APPLIED TECHNOLOGY INITIATIVES TECHNICAL AND ENGINEERING SUPPORT
POC Monica Williams, Contract Specialist, AMSAM-AC-RD-BB,
(256)876-8341 17. This synopsis announces a DRAFT Request for Proposal
for technical and engineering support to the U.S. Army Aviation and
Missile Command, Applied Technology Initiatives (ATI) Directorate for
Statement of Work (SOW) entitled "Applied Technology Initiative
Technical and Engineering Support." The SOW provides technical and
engineering support in performance of the Directorate's Mission to
design, integrate and test advanced technology weapon systems and
systems of systems dedicated to increasing the power projection
capabilities of Army forces by decreased target-acquisition and
engagement timelines, increased lethality of systems, increased
survivability of systems and solders and increased control of tempo of
battle. The contractor shall be required to perform a major portion of
this effort on-site (Redstone Arsenal, AL). The SIC Code for this
acquisition is 8731. This acquisition will be solicited utilizing full
and open competitive procedures. The Government intends to award up to
2 contracts as aresult of this solicitation. The first contract award
is to be made to the best value proposal without regard to status and
the second contract award is to be made to the best value proposed
submitted by a small business. The Government reserves the right to
make less than 2 awards. Cost-Plus-Fixed-Fee-Level-Of-Effort contracts
are anticipated as a result of this solicitation. The contracts will
be made for a term of the base year and four option years (total effort
60-months). The basic level-of-effort will be determined at time of
award. Option I -- Year I, level-of-effort will consist of 393,500
manhours. Option I -- Year II, level of effort will consist of 206,900
manhours. Option III -- Year III, level-of-effort will consist of
206,900 manhours. Option IV -- Year IV, level-of-effort will consist of
206,900 manhours. Option V -- Year V, level-of-effort will consist of
312,550 manhours. Therefore, the total consists of 1,326,750 manhours.
*POC for inquiries generated by this synopsis is Monica Williams,
ATTN: AMSAM-AC-RD-BB, address above. Request for DRAFT solicitation
packages must be received in writing. Request should be sent to the
address above. ATTN: AMSAM-AC-RD-BB or sent via facsimile to (205)
876-7528, ATTN: Monica Williams. Written comments are solicited for the
purpose of obtaining industry feedback on the content and purpose of
the DRFP and must be received within 30 days after release of the DRFP.
Estimated release date of the DRFP is on or about 01 Jul 98. (0162) Loren Data Corp. http://www.ld.com (SYN# 0004 19980615\A-0004.SOL)
A - Research and Development Index Page
|
|