COMMERCE BUSINESS DAILY ISSUE OF JUNE 17,1998 PSA#2118Bureau of Reclamation, Contracts Group, 1150 N. Curtis Road, Suite 100,
Boise, Idaho 83706-1234 Y -- ECHO PUMPING PLANT AND PIPELINE, STANFIELD WATER EXCHANGE
FACILITIES, UMATILLA BASIN PROJECT, OREGON SOL 1425-98-SI-10-07640 DUE
080698 POC Contracting Officer, D. Scott Shelley ; Contact Susie
Zimmer, Contract Specialist 208-378-5156 Pre-Solicitation Notice for
Solicitation No. 1425-98-SI-10-07640 is currently available -- The
solicitation will be issued on or about July 6, 1998. Estimated price
range of the work is between $500,000 and $1,000,000 -- Copies of
solicitation provided on receipt of $26.00 each, nonrefundable. The
principal components of the work to be performed under these
specifications include earthwork for and construction of 12-, 8-, 6-
and 4-inch-diameter buried pipelines; clearing and grubbing sagebrush
and trees at locations along the pipeline alignment; roadway work
including: cutting, removal, and replacement of asphalt paved city
streets in Echo for pipeline construction; removal and replacement of
gravel surfacing on existing roads for pipeline construction; jacking
casing pipe under state highway 320; and gravel surfacing for new
roads, pumping plant, and storage tank yard areas; utility crossings
where the Echo pipeline crosses existing water, sewer, and
communications lines; traffic control when working on city, county, and
state road right-of-ways; precast concrete vaults for valves and
meters; earthwork for and construction of three reinforced concrete
turnout structure from Main Furnish Ditch, at the beginning of the Echo
pipeline; earthwork for and construction of reinforced concrete
foundations for the Echo pumping plant and air chamber; earthwork for
and construction of one 25,000 gallon reinforced concrete inground
storage tank with precast concrete plank cover; earthwork for and
construction of three reinforced concrete outlet structures in Main
Furnish Ditch and Feed Canal; Echo pumping plant, a 4.5 cfs outdoor
pumping plant with 3 equal sized centrifugal pumps, manifolds, and
valves; one air chamber, including air compressor, at the Echo pumping
plant; an electrical and control system for the Echo pumping plant;
removal and replacing existing fence along portions of the Echo
pipeline; chain link fence at the Echo pumping plant and inground
storage tank; new barbed wire fence; pipe flow metersin 1-inch to
12-inch sizes; air release vacuum valves in 2- and 4-inch sizes; gate
and ball valves in 1-inch to 12-inch sizes; miscellaneous metalwork for
the concrete turnout structure, inground storage tank, and pipeline
outlet structures; Fax number 208-378-5108, E-mail address
dlarrondo@pn.usbr.gov.***** (0166) Loren Data Corp. http://www.ld.com (SYN# 0107 19980617\Y-0013.SOL)
Y - Construction of Structures and Facilities Index Page
|
|