|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 18,1998 PSA#2119Bureau of Reclamation, Contracts Group, 1150 N. Curtis Road, Suite 100,
Boise, Idaho 83706-1234 Y -- RESERVOIR "A", SAFETY OF DAMS MODIFICATIONS, LEWISTON ORCHARDS
PROJECT, IDAHO SOL 1425-98-SI-10-07600 DUE 082098 POC Contracting
Officer, D. Scott Shelley; Contact Susie Zimmer, Contract Specialist
208-378-5156 Pre-Solicitation Notice for Solicitation No.
1425-98-SI-10-07600 is currently available -- The solicitation will be
issued on or about July 21, 1998. Estimated price range of the work is
between $1,000,000 and $5,000,000 -- Copies of solicitation provided on
receipt of $30.00 each, nonrefundable. The principal components of the
work to be performed under these specifications include constructing
temporary bypass works to bypass outlet works releases during
construction; removing and controlling water to unwater and dewater
foundations and excavations; selectively removing existing concrete
structures, pipe, and buried powerlines; clearing and grubbing site
areas of vegetation and trash; seeding areas disturbed during
construction; slush grouting foundation surfaces with cementitious
grout; furnishing and installing 12-inch-diameter perforated corrugated
drain pipe for toe drains; furnishing and installing precast concrete
cleanout manholes for toe drains; furnishing and installing a
fiberglass trapezoidal measuring flume; stripping site areas of
topsoil; excavation for steel pipes and vault structures; excavation
for foundation of new stability berm; placing and compacting backfill
for steel pipes and vault structures; placing and compacting earthfill
materials obtained from excavation and borrow to construct new
stability berm; furnishing, placing, and compacting sand filter and
gravel drain materials to construct new stability berm; placing topsoil
on new stability berm and site areas; furnishing, placing, and
compacting gravel surfacing on site areas; constructing reinforced
cast-in-place concrete for vault bases; designing, furnishing, and
installing two precast concrete vaults; furnishing and installing metal
ladders, covers, roof hatches, and grating for vaults and manholes;
furnishing and installing steel piping and fishscreen tank; capping
existing 2-inch steel pipe under live reservoir pressure and removing
pipe downstream of cap; furnishing and installing a sump pumping unit;
furnishing and installing the heating and ventilating system;
furnishing and installing a distribution panelboard, a combination
transformer and load center, and two combination magnetic starters;
furnishing and installing disconnect switches and a meter structure and
socket; furnishing and installing the lighting system and receptacles;
furnishing and installing ground cable, electrical conduit, and
insulated conductors; and removing existing electrical equipment
consisting of a meter, two panelboards, and a disconnect switch and
removing existing lighting system within the tunnel portal. Fax number
208-378-5108, E-mail address dlarrondo@pn.usbr.gov.***** (0167) Loren Data Corp. http://www.ld.com (SYN# 0149 19980618\Y-0019.SOL)
Y - Construction of Structures and Facilities Index Page
|
|