Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 25,1998 PSA#2124

Sa-Alc/Power Systems Branch, 500 Perrin, Suite #3, Kelly Afb, Texas 78241-6449

J -- GTE/APU SOL F41608-98-R-39520 DUE 081098 POC For copy, Fax request to LDKJ at (210)925-1058, For additional information contact Cook, D/Ldkj/[210]925-8881 A four (4) year requirement contract for the repair/overhaul of SA/GTC 85 SERIES FOUR (4) BEARING GAS TURBINE ENGINES/96-105 and related components all applicable to multiple aircraft. Representative items for repair are the NSN: 2835-00-777-4035, P/N: 376880, NOUN: GTE, APPL: 85-72 and the NSN: 2835-00-724-0088, P/N: 378374-1, NOUN: APU, APPL: 85-56. This list may not be comprehensive. The Government reserves the right to incorporate similar items. The requirement contract will incorporate a one (1) year basic ordering period with three (3) additional option periods of one (1) year rach. The combined Best Estimated Quantities (BEQs) and estimated Over & Above Hours are: BEQ O&A Basic Year: 79 each 45 Hours Option Yr 1: 79 each 20 Hours Option Yr 2: 79 each 20 Hours Option Yr 3: 79 each 20 Hours The Government's required delivery schedule is 5 each per month starting 60 calendar days after receipt of the delivery order and reparables, whichever is later and continue at the rate of 5 each per month each month thereafter until complete. Repairs shall be performed in accordance with Appendix A and all applicable technical orders referenced therein; and, in accordance with Appendix C. Government Furnished Material (GFM) is authorized in accordance with Appendix B. DATA and Military Packaging are also required. Quality: Standard Inspection and ISO 9002. Qualification Requirements: All sources must be qualified prior to consideration for award. Qualification Requirements for this effort were synopsized in in conjunction with F41608-97-R-0021/F41608-98-D-0025. Resynopsis of the Qualification Requirement is anticipated. The following notes apply: 9, 23, 26. Qualification requirements: Sources must be qualified prior to being considered for award. The solicitation will contain instructions for obtaining further information on this requirement. The requirements of FAR 9.202(A) have been completed and copies of the qualification requirements and standards may be obtained as described in the solicitation. These qualification requirements apply to line item(s) all The approximate issue/response date will be 10 Jul 98. To: Allied Signal Inc, Phoenix Az 85072-2181. To: Alliedsignal Inc, Tempe Az 85282 0000. To: israel aircraft industries, . To: Microturbo Inc, Grand Prairie Tx 75051-7027. No telephone requests. Only written or faxed requests received directly from the requestor are acceptable. All responsible sources solicited may submit a bid, proposal, or quotation which shall be considered. See Note (s) 9, 23, 26. (0174)

Loren Data Corp. http://www.ld.com (SYN# 0050 19980625\J-0004.SOL)


J - Maintenance, Repair and Rebuilding of Equipment Index Page