Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 26,1998 PSA#2125

USCG, CEU Providence, 300 Metro Center Blvd, Warwick, RI 02886

Z -- REPLACE SUSPENDED CEILINGS AT THE BARRACKS AT GROUP SOUTHWEST HARBOR, ME SOL DTCGG1-98-Q-3WK183 DUE 080698 POC Susan Hetrick, Contracting Officer, (401)736-1763 Contractor shall provide all labor, material, supervision, and transportation for the removal and installation of approximately 7500 SF of suspended ceilings including support systems. There are 94 light fixtures to be removed. Contractor shall provide and install 96 new energy efficient light fixtures. There are also 88 fire alarm, public address and miscellaneous devices which must be removed from the existing ceiling and reinstalled in the new system. Approximately 3300 SF of the existing ceiling has loose laid batt insulation placed on the ceiling. This insulation will be removed without replacement. The work schedule limits the number of rooms that may be out of service at any one time. Performance period is 90 days after receipt of Notice to Proceed. Estimated cost range is between $25,000 and $100,000. SIC is 1522. This solicitation is issued pursuant to the Small Business Competitiveness Demonstration Program and is issued unrestricted. Solicitation packages to be available on/about 14 July 1998 from R. I. Blueprint, 335 Webster Ave., Cranston, RI 02920, telephone (401)942-3225. Contact RI Blueprint directly for nonrefundable cost of package. VISA, Mastercard & American Express accepted. Offerors are required to verify the number of amendments issued, if any, with the Contracting Officer prior to due date. The due date for receipt of offers is on/about 6 August 1998 at 4:00 PM. Posted 06/24/98 (0175)

Loren Data Corp. http://www.ld.com (SYN# 0162 19980626\Z-0035.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page