|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 26,1998 PSA#2125USCG, CEU Providence, 300 Metro Center Blvd, Warwick, RI 02886 Z -- REPLACE SUSPENDED CEILINGS AT THE BARRACKS AT GROUP SOUTHWEST
HARBOR, ME SOL DTCGG1-98-Q-3WK183 DUE 080698 POC Susan Hetrick,
Contracting Officer, (401)736-1763 Contractor shall provide all labor,
material, supervision, and transportation for the removal and
installation of approximately 7500 SF of suspended ceilings including
support systems. There are 94 light fixtures to be removed. Contractor
shall provide and install 96 new energy efficient light fixtures.
There are also 88 fire alarm, public address and miscellaneous devices
which must be removed from the existing ceiling and reinstalled in the
new system. Approximately 3300 SF of the existing ceiling has loose
laid batt insulation placed on the ceiling. This insulation will be
removed without replacement. The work schedule limits the number of
rooms that may be out of service at any one time. Performance period is
90 days after receipt of Notice to Proceed. Estimated cost range is
between $25,000 and $100,000. SIC is 1522. This solicitation is issued
pursuant to the Small Business Competitiveness Demonstration Program
and is issued unrestricted. Solicitation packages to be available
on/about 14 July 1998 from R. I. Blueprint, 335 Webster Ave., Cranston,
RI 02920, telephone (401)942-3225. Contact RI Blueprint directly for
nonrefundable cost of package. VISA, Mastercard & American Express
accepted. Offerors are required to verify the number of amendments
issued, if any, with the Contracting Officer prior to due date. The due
date for receipt of offers is on/about 6 August 1998 at 4:00 PM. Posted
06/24/98 (0175) Loren Data Corp. http://www.ld.com (SYN# 0162 19980626\Z-0035.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|