|
COMMERCE BUSINESS DAILY ISSUE OF JULY 1,1998 PSA#2128U.S. Forest Service, Plumas National Forest, 159 Lawrence Street, P.O.
Box 11500, Quincy, CA 95971 Y -- FEATHER FALLS BRIDGE REPLACEMENT PROJECT. SOL RFP R5-11-98-71 DUE
081898 POC Sue Wickman, Contracting Officer, (530) 283-2050 Consists of
the installation of 2 each 6' x 40' prefabricated bridges, abutments
and trail tread approaches. The lower trail at Frey Crk. and Sta. 70+20
upper trail are the bridge sites. Sta 44+00 to 46+00 (upper trail) will
require reconstruction, including CMP and log retaining wall
installation, excavation and riprap placement. The 30' bridge,
washed-out at Sta. 70+20, will be removed and hauled to the Forest
Supervisor's Office, in Quincy, CA and Frey Crk. bridge removed from
government property. Posted 06/29/98 (0180) Loren Data Corp. http://www.ld.com (SYN# 0105 19980701\Y-0010.SOL)
Y - Construction of Structures and Facilities Index Page
|
|