|
COMMERCE BUSINESS DAILY ISSUE OF JULY 6,1998 PSA#2130USDA Forest Service, 2222 West 2300 South, Salt Lake City, Utah 84119 Y -- PONDEROSA CAMPGROUND/MAPLE BENCH CAMPGROUND WATER SYSTEM
REDEVELOPMENT PROJECT ON THE UINTA NATIONAL FOREST SOL IFB 18-98-051
DUE 082498 POC Nelda Montgomery, 801/975-3443/Contracting Officer Karen
A. Goodsell, 801/975-3442 WEB: nmontgom/wo_gsc@fs.fed.us,
nmontgom/wo_gsc@fs.fed.us. The Ponderosa project consists of placing a
protective soil cover over the existing spring development including
an extension of head box; installing a 4400 gal. ployethylene storage
tank inside and existing 6500 existing tank; replacing hydraulic ram
and enclosure; installing a precast concrete box with hypochlorinator;
installing approx. 4000 linear feet of waterline and valves; and
installing 2 campground hydrants. Project located approx. 10 miles
northeast of Nephi, UT. Maple Bench project consists of redevelopment
of existing point spring source, including removal of existing CMP
collection box; installing a new concrete collection manhole, coarse
gravel, impervious clay backfill, EPDM liner and protective soil cover
installing precast concrete box with hypochorinator; installing 4000
gal. steel storage tank; installing approx. 1200 linear feet of
waterline with valves; and installing 2 campground hydrants. Project
located approx. 6 miles So. of Payson, UT. This proposed procurement is
between $100,000 and $250,000. Plans will be available at a $15
non-refundable charge. Solicitation may be ordered in writing to the
above address.***** Posted 07/01/98. (0182) Loren Data Corp. http://www.ld.com (SYN# 0172 19980706\Y-0036.SOL)
Y - Construction of Structures and Facilities Index Page
|
|