COMMERCE BUSINESS DAILY ISSUE OF JULY 10,1998 PSA#2134Bi-State Development Agency, 707 North First Street, St Louis, Missouri
63102 58 -- COMMUNICATION SYSTEM FOR THE ST. CLAIR COUNTY METROLINK
EXTENSION SOL ML-97-SB-2328 DUE 091798 POC Deborah M. Rowey (314)
982-1400 ext. 1363 WEB: Bi-State Development Agency, www.bi-state.org.
E-MAIL: Deborah Rowey -- Bi-State Development Agency, drowey@bsda.org.
INVITATION FOR BIDS FOR COMMUNICATION SYSTEM FOR THE ST. CLAIR COUNTY
METROLINK EXTENSION SEALED BID NO. ML-97-SB-2328 The Bi-State
Development Agency (Agency) is soliciting bids for the communications
system design and construction from 5th & Missouri to Belleville Area
College for the St. Clair County MetroLink Extension. The Disadvantage
Business Enterprise (DBE) participation goal is 22%. DBE firms are
invited to propose directly or with another firm. The work consists of
design, fabrication, manufacturing, assembly, installation, factory
and field testing, commissioning, and warranting of all facts of the
communication system. The communication system will include: fire and
intrusion system, expanded mobile radio system, expanded carrier
transmission, expanded Central Control Facility (CCF), microprocessor
controlled communications unit (MCCU), expanded emergency telephone
system (ETS), expanded passenger assistance telephone (PAT), expanded
public address (PA) system, expanded closed circuittelevision (CCTV),
expanded supervisory control and data acquisition (SCADA) system, all
cables and connection, all battery systems, system training, and all
spare material and test equipment necessary. The integration to the
existing LRT system will also be a responsibility of this procurement.
Pre-Bid Conference 8/18/98 Bid Opening 9/17/98 Questions should be
addressed to Ms. Deborah Rowey, MetroLink Contracts & Procurement. Fax
questions to (314) 923-3022 or mail to Bi-State Development Agency,
707 N. 1st St., St. Louis MO 63102. Please include the sealed bid
number, your company name, and complete address and both telephone and
fax numbers. Copies of the Project Manuals and Drawings may be
obtained by appointment only beginning August 3, 1998, Monday -- Friday
between the hours of 8 a.m. -- 12 p.m. and 1 p.m. -- 5 p.m. at the
MetroLink Document Control Department by calling Ms. Sandra Armstrong
(314) 982-1400 Ext. 1329. The cost for a set of plans and contract
documents is $275.00. This cost is non-refundable. Each request must be
accompanied by either a certified check, money order, or cashiers check
payable to Bi-State Development Agency. Written requests including
arrangements for pick up for plans and documents should be addressed to
Ms. Sandra Armstrong, MetroLink, Second Floor, 707 N. First Street, St.
Louis, Missouri 63102. Shipping costs are the responsibility of the
requestor. Therefore, all requestors desiring to have a set(s) of plans
and documents mailed are required to provide Ms. Sandra Armstrong with
a Federal Express, UPS etc. account number. Mailed-in requests will be
returned, if this information is not provided. This project is financed
in part by the Federal Transit Administration (FTA) of the United
States Department of Transportation. Any contract resulting from this
solicitation will be subject to the terms of the financial assistance
contract between the Agency and the FTA. Anticipated St. Clair County
MetroLink Extension Construction Procurement Schedule
ContractDescription Bid Release Date ML-97-SB-2329 -- Station Finishes
July 6, 1999 Posted 07/08/98. (0189) Loren Data Corp. http://www.ld.com (SYN# 0367 19980710\58-0002.SOL)
58 - Communication, Detection and Coherent Radiation Equipment Index Page
|
|