|
COMMERCE BUSINESS DAILY ISSUE OF JULY 10,1998 PSA#2134Department of The Army, Directorate of Contracting, Building 622, Fort
Stewart, Georgia 31314-5189 Z -- TEST SITE FOR TANK TRAIL STABILIZATION SOL DAKF10-98-#-0020 DUE
082598 POC Mae Riggens, (912)767-1868, Connie Skipper, Contracting
Officer, (912) 767-1868 WEB: DOC Homepage,
http://www.stewart.army.mil/doc/intro.htm. The Army requires a contract
to Construct Test Areas for Stabilization of Tank Trails, Fort Stewart,
Georgia. The work includes, but is not limited to, construct, maintain,
and remove bypass road; clear, grub, grade existing tank trail surface,
construct test areas on tank trail; and grass both sides. Performance
shall be completed within 60 calendar days after receipt of Notice to
Proceed. The magnitude of the project is between $250,000 and $500,000.
The SIC is 1611. This requirement will be solicited on an unrestricted
basis. There is a non-refundable fee of $25.00 for the solicitation
package. Fee shall be submitted with written request for the package.
The fee shall be in the form of a Certified Check, Company Check, or
Money Order and made payable to the TREASURER OF THE UNITED STATES. NO
CASH will be accepted. When requesting a package, be sure to include
a brief description of the project Posted 07/08/98. (0189) Loren Data Corp. http://www.ld.com (SYN# 0210 19980710\Z-0039.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|