|
COMMERCE BUSINESS DAILY ISSUE OF JULY 14,1998 PSA#2136Arnold Engineering Development Center, Attn: AEDC PKP, 100 Kindel
Drive, Suite A332, Arnold AFB TN 37389-1332 61 -- REPLACE SIX NEW DRY-TYPE AIR-CORE SERIES CONNECTED TAPPED
REACTORS SOL F40650-98-R-0025 DUE 082198 POC Tony Clayborne,
Contracting Officer, (931) 454-7841 This requirement is for providing
and installing six new single phase, dry-type air-core series connected
tapped reactors. The reactors are connected to AC power systems to
control power flow and limit fault current. The replacement of these
six reactors are due to cracking of the concrete supports. The
performance period shall be 300 calendar days from contract award date.
Actual on-site installation shall be accomplished during a single
contiguous downtime period of ten calendar days. All existing reactors
and other material to be removed will remain the property of the
Government and the contractor shall transport all removed equipment to
the AEDC warehouse for disposition by the Government. Any responsible
source may submit a proposal which shall be considered. Firms
responding to this synopsis shall do so in writing and indicate whether
they are a minority business concern. Foreign participation is
authorized. Posted 07/10/98. (0191) Loren Data Corp. http://www.ld.com (SYN# 0321 19980714\61-0002.SOL)
61 - Electric Wire and Power and Distribution Equipment Index Page
|
|