COMMERCE BUSINESS DAILY ISSUE OF JULY 14,1998 PSA#2136U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 Y -- MISCELLANEOUS O&M WORK, FORT BRAGG, NC SOL DACA21-98-B-0062 POC
Gregory Hixson (Technical Questions) 912-652-5189; Linda Elliott
(Contractual Questions) 912-652-5076 WEB: Corps of Engineers, Savannah
District, Contracting, http://www.usace.army.mil. E-MAIL: Linda G.
Elliott, linga.g.elliott@sas02.usace.army.mil. DESCRIPTION OF WORK:
Schedule I: Replace 750-ton cooling tower and replace oil burners.
Schedule II: Replace piping, values, controls and heat exchangers in 13
buildings. Abate asbestos containing material. Schedules III and IV:
Construct additions to accommodate new make-up air units. Demolish
existing HVAC systems and provide new split system heat pumps. Upgrade
electrical. Schedule V: Provide new HVAC units and exhaust hood.
Upgrade electrical. Schedule VI: Waterproof basement of 60,000 square
foot facility. Expose and waterproof basement exterior walls and
provide subsurface drainage system. Schedules VII and VIII: Renovate
existing latrines, to include new showers and locker room, replace
showers, toilets and lavatories. Modify plumbing and provide lighting.
Schedule IX: Repair walls, install new wall coverings and chair rail,
replace all ceiling tiles, and paint surface. Estimated construction
ranges: Schedule I -- $250,000 to $500,000; Schedule II: -- $1,000,000
to $5,000,000; Schedule III—$500,000 to $1,000,000; Schedule IV
-- $500,000 to $1,000,000; Schedule V -- $100,000 to $250,000;
Schedule VI -- $250,000 to $500,000; Schedule VII -- $100,000 to
$250,000; Schedule VIII -- $100, 000 to $250,000; Schedule IX --
$100,000 to $250,000. Subcontracting Plan required: No for Schedules I
and III through IX: Yes for Schedule II. Network Analysis System will
be required. THIS SOLICITATION IS ISSUED ON AN UNRESTRICTED BASIS
PURSUANT TO THE "BUSINESS OPPORTUNITY DEVELOPMENT REFORM ACT OF 1988"
(Public Law 100-656). NOTE: ALL REQUESTS FOR SOLICITATIONS MUST BE MADE
IN WRITING AND RECEIVED NOT LATER THAN 07/20/98. A LIMITED NUMBER OF
SOLICITATIONS WILL BE PREPARED AND ISSUED ON A FIRST COME FIRST SERVED
BASIS. THE NUMBER OF SOLICITATIONS WILL BE LIMITED TO ONE (1) PER
FIRM. STATE AREA CODE, TELEPHONE NUMBER, STREET ADDRESS AND NINE-DIGIT
ZIP CODE IN REQUESTS. REQUESTS MAY BE FAXED TO 912-652-5828. Posted
07/10/98. (0191) Loren Data Corp. http://www.ld.com (SYN# 0121 19980714\Y-0017.SOL)