|
COMMERCE BUSINESS DAILY ISSUE OF JULY 15,1998 PSA#2137Fleet & Industrial Supply Center, Regional Contracts Dept, Attn: Bid
Officer/Code 210A94, 937 N. Harbor Drive, Suite 212, San Diego, CA
92132-0212 35 -- CRANE LOAD INDICATING DEVICES SOL N00244-98-Q-0340 DUE 072998
POC Bid Officer 619-532-2690, 619-532-1088 (fax); Contract Specialist
Bill Archambeault WEB: Click here to find more information of FISC San
Diego, http://www.sd.fisc.navy.mil. E-MAIL: Click here to contact
Contract Specialist 619-532-2894;,
William_R_Archambeault@fmso.navy.mil. This is a combined
synopsis/solicitation for commercial items prepared in accordance with
the format in FAR part 12.6, as supplemented with additional
information included in this notice. This announcement constitutes the
only solicitation to be issued; proposals are being requested and a
written solicitation will not be issued. The solicitation number for
this Request for Quote is N00244-98-Q-0340. This solicitation and
incorporated provisions and clauses are those in effect through Federal
Acquisition Circular 47. This solicitation is issued on a restricted
basis. The Standard Industrial Code is 3536 and applies to businesses
with less than 500 employees. FISC San Diego has a requirement for
crane load indicating devices, plus installation and calibration.
Statement of work/specifications:1). Requirements for the Linkbelt
Model HC238B 140 Ton Lattice Boom Crane: a. Replace the existing Mark
Load Indicating Device. System must meet specifications of the PAT EI65
or equal. b. Must be compatible with:i.12v electrical system ii. 1"
wire rope c. Must meet the following criteria: i. Simultaneously
display the Boom Length, Angle, Radius, Tip height, and Load.ii.
Programmable for variations in load and quadrants of operation.iii.
Include an Anti-two block system with audio and visual alert.iv.
Anti-two block system must not lock-out load controlling devices.v.
Running line type load sensing potentiometer. vi. Ability to be
adjusted by the operator for variance boom lengths of 50' to 89'. d.
Must be able to withstand a corrosive environment of salt air and
water. All connections and the monitor panel must be watertight.e.
System cannot affect any load bearing elements of cause any variations
tot he manufacturer's original equipment. 2). Requirements for Grove
RT875 75 Ton Hydraulic crane USN 82-05012: a. Repair and upgrade the
existing PAT EI20 Load Indicating Device to include a Load Moment
indicator. System must meet specifications of the PAT DS350GW or
equal.b. Must be compatible with:i. 12v electrical systemii. 3/4" wire
rope c. System must meet the following criteria: i. Be compatible with
existing system hardware. ii. Include a light bar type readout for high
visibility. iii. Simultaneously display the Boom Length, Angle, Radius,
Tip height, and Load. iv. Display panel must be capable of showing
relative load moment, maximum permissible load and actual load. v.
Include an Anti-two block system with audio and visual alert. vi.
Anti-two block system must not lockout load controlling devices. vii.
Utilize a hydraulic pressure transducer in the lift cylinder circuit.
viii. Display panel must be in the operator's field of vision during
operation. ix. Include zero degree load capacities. x. Include a 30'
swing away extension. 3). Requirements for Grove RT875 75 Ton Hydraulic
crane USN 82-05144: a. Repair and upgrade the existing PAT EI20 Load
Indicating Device to include a Load Moment indicator. System must meet
specifications of the PAT DS350GW or equal. b. Must be compatible
with: i. 12v electrical system ii. 3/4" wire rope c. System must meet
the following criteria: i. Be compatible with existing system hardware.
ii. Include a light bar type readout for high visibility. iii.
Simultaneously display the Boom Length, Angle, Radius, Tip height, and
Load. iv. Display panel must be capable of showing relative load
moment, maximum permissible load and actual load. v. Include an
Anti-two block system with audio and visual alert. vi. Anti-two block
system must not lockout load controlling devices. vii. Utilize a
hydraulic pressure transducer in the lift cylinder circuit. viii.
Display panel must be in the operator's field of vision during
operation. ix. Include zero degree load capacities. x. Include a 30'
swing away extension. 4). Requirements for Grove RT875 75 Ton Hydraulic
crane USN 82-05010 a. Repair and upgrade the existing PAT EI20 Load
Indicating Device to include a Load Moment indicator. System must meet
specifications of the PAT DS350GW or equal. b. Must be compatible
with: i. 12v electrical system ii. 3/4" wire rope c. System must meet
the following criteria: i. Be compatible with existing system hardware.
ii. Include a light bar type readout for high visibility. iii.
Simultaneously display the Boom Length, Angle, Radius, Tip height, and
Load. iv. Display panel must be capable of showing relative load
moment, maximum permissible load and actual load. v. Include an
Anti-two block system with audio and visual alert. vi. Anti-two block
system must not lockout load controlling devices. vii. Utilize a
hydraulic pressure transducer in the lift cylinder circuit. viii.
Display panel must be in the operator's field of vision during
operation. ix. Include zero degree load capacities. x. Include a 30'
swing away extension. 5). Requirements for Grove RT875 75 Ton Hydraulic
crane USN 82-05011: a. Repair and upgrade the existing PAT EI20 Load
Indicating Device to include a Load Moment indicator. System must meet
specifications of the PAT DS350GW or equal. b. Must be compatible
with: i. 12v electrical system ii. 3/4" wire rope c. System must meet
the following criteria: i. Be compatible with existing system hardware.
ii. Include a light bar type readout for high visibility. iii.
Simultaneously display the Boom Length, Angle, Radius, Tip height, and
Load. iv. Display panel must be capable of showing relative load
moment, maximum permissible load and actual load. v. Include an
Anti-two block system with audio and visual alert. vi. Anti-two block
system must not lockout load controlling devices. vii. Utilize a
hydraulic pressure transducer in the lift cylinder circuit. viii.
Display panel must be in the operator's field of vision during
operation. ix. Include zero degree load capacities. x. Include a 30'
swing away extension. 6). Requirements for Grove RT630 30 Ton Hydraulic
crane USN 82-05021: a. Repair and upgrade the existing PAT EI20 Load
Indicating Device to include a Load Moment indicator. System must meet
specifications of the PAT DS350GW or equal. b. Must be compatible
with: i. 12v electrical system ii. 5/8" wire rope c. System must meet
the following criteria: i. Be compatible with existing system hardware.
ii. Include a light bar type readout for high visibility. iii.
Simultaneously display the Boom Length, Angle, Radius, Tip height, and
Load. iv. Display panel must be capable of showing relative load
moment, maximum permissible load and actual load. v. Include an
Anti-two block system with audio and visual alert. vi. Anti-two block
system must not lockout load controlling devices. vii. Utilize a
hydraulic pressure transducer in the lift cylinder circuit. viii.
Display panel must be in the operator's field of vision during
operation. ix. Include zero degree load capacities. x. Include a 30'
swing away extension. 7). Requirements for Grove RT630 30 Ton Hydraulic
crane USN 82-04837. a. Repair and upgrade the existing PAT DS350 Load
Indicating Device and Load Moment Indicator. System must meet
specifications of the PAT DS350GW or equal. b. Must be compatible with:
i. 12v electrical system ii. 5/8" wire rope c. System must meet the
following criteria: i. Be compatible with existing system hardware. ii.
Include a light bar type readout for high visibility. iii.
Simultaneously display the Boom Length, Angle, Radius, Tip height, and
Load. iv. Display panel must also be capable of showing relative load
moment, maximum permissible load and actual load. v. Include an
Anti-two block system with audio and visual alert. vi. Anti-two block
system must not lockout load controlling devices. vii. Utilize a
hydraulic pressure transducer in the lift cylinder circuit. viii.
Display panel must be in the operator's field of vision during
operation. ix. Include zero degree load capacities. x. Include a 30'
swing away extension. Inspection and acceptance of material will be
done by Receiving Officer, Amphibious Construction Battalion One, NAB
Coronado. Offerors must be registered in the Central Contractor
Registration database. The following provisions and clauses are
applicable and hereby incorporated into the solicitation by reference
and will be provided by the Contracting Officer in full text upon
request. FAR 52.212-1; FAR 52.212-2; FAR 52.212-4; FAR 52.212-5; FAR
52.222-26; FAR 52.222-35; FAR 52.222-36; FAR 52.222-37; DFAR
252.212-7001, contract terms and conditions. Responses from responsible
offerors and inquiries may be faxed to Bill Archambeault at
619-532-2347 or the Bid Officer at 619-532-1088. See note 1**** Posted
07/13/98 (W-SN222192). (0194) Loren Data Corp. http://www.ld.com (SYN# 0291 19980715\35-0003.SOL)
35 - Service and Trade Equipment Index Page
|
|