COMMERCE BUSINESS DAILY ISSUE OF JULY 16,1998 PSA#2138USDA-Natural Resources Conservation Service, Attn: Contracting Officer,
100 East B Street, Room 3124, Casper, WY 82601-1969 Y -- EARTHEN CONSTRUCTION OF THE EAST GREELEY PHASE OF ALLISON DRAW
FLOOD CONTROL CHANNEL PROJECT SOL NRCS-1-WY-98 DUE 090198 POC Sue
Jones, Contracting Officer, 307-261-6468, FAX 307-261-6490 Allison Draw
Watershed -- East Greeley Phase -- Earthen Construction. Construction
will consist of mobilization; approx. 10 acres of seeding and mulching;
dewatering; 20,460 cuyd common excavation; 1789 cuyd channel topsoil;
3257 cuyd rock riprap; 918 cuyd gravel bedding; 6400 sqyd geotextile;
1000 lf silt fence; and traffic control. Project is located on both
sides of Greeley Highway, south of Fox Farm Road in Cheyenne, Wyoming.
Performance time is 84 calendar days. Estimated price range $100,000
to $250,000. Contractors submitting a bid for this project are strongly
urged to attend the site showing planned for August 11, 1998. All
responsible sources may submit a bid which will be considered by the
agency. IFB will be available o/a July 30, 1998. Posted 07/14/98
(W-SN222898). (0195) Loren Data Corp. http://www.ld.com (SYN# 0158 19980716\Y-0017.SOL)