Contracting Office, Siuslaw National Forest, P.O. Box 1148, Corvallis, OR 97339

Y -- ENCHANTED VALLEY STREAM RESTORATION SOL IFB R6-12-98-602 DUE 091098 POC Contact, Administrative Services, 541/750-7118 This project consists of two phases: Phase 1 consists of approximately 9,732 cubic yards of excavation for a new meandering stream channel with curved pool areas and straight riffle areas. The excavation will be stockpiled over the winter (1999) in areas adjacent to Bailey Creek. Large woody debris will be placed in the new channel in curved pool sections and the channel will sit over the winter (1999) to stabilize. Phase 2 consists of diverting Bailey Creek into the new channel, plugging segments of the old channel with stockpiled embankment, creating pond outlet areas and dips in the existing road, constructing a road ford through the new channel, removal of one bridge, moving one bridge to construct a trail bridge, erosion control and road closure device placement. This project is located on the Siuslaw National Forest, Mapleton Ranger District, Lane County, Oregon. The Contractor shall furnish all labor, equipment, supervision, transportation, supplies (except those designated as Government-furnished) and incidentals to accomplish all work necessary. Contract time is 500 calendar days after receipt of the Notice to Proceed. Government estimate is between S100,000 and S250,000. Bonding is required. Estimated start work date is July 15, 1999. This solicitation is not set-aside for small business concerns. Posted 07/23/98 (I-SN227414). (0204)

Loren Data Corp. http://www.ld.com (SYN# 0162 19980727\Y-0022.SOL)


Y - Construction of Structures and Facilities Index Page