COMMERCE BUSINESS DAILY ISSUE OF JULY 30,1998 PSA#2148USAED, Sacramento, Corps of Engineers, Attn: A-E Negotiations Section,
1325 J Street, Room 1079, Sacramento, CA 95814-2922 C -- DESIGN OF MEDICAL CLINIC REPLACEMENT/DENTAL CLINIC ALTERATION,
EDWARDS AFB, CA SOL DACA05-98-R-0052 DUE 082898 POC Mr. Ken Parkinson,
Unit Leader A-E Negotiations, 916/557-7470 WEB:
http://www.spk.usace.army.mil:80/cespk-ct,
http://www.spk.usace.army.mil:80/cespk-ct. E-MAIL:
rware-rosas@spk.usace.army.mil, rware-rosas@spk.usace.army.mil. 1.
CONTRACT INFORMATION. Line 2 is corrected to read, "Construction phase
services may include preparation of operation and maintenance manuals
and shop drawing REVIEW." Lines 15, 16, 17, 18, and 19 are corrected
to read, "All interested firms are reminded that in accordance with the
provisions of PL 95-507, they will be expected to place subcontracts
with small and small disadvantaged businesses to the maximum
practicable extent consistent with the efficient performance of this
contract. The following subcontracting goals of the Sacramento District
will be considered in the negotiation of this contract: of the
subcontracted work, 62% to small businesses, 10% to small disadvantaged
businesses (subset of small business) and 5% to woman-owned small
businesses (subset of small businesses). The firms selected for
negotiations of this contract will be required to submit a detailed
subcontracting plan during negotiations." 2. PROJECT INFORMATION. Line
1 is corrected to read, "This project will design a medical/dental
clinic of approximately 4,361 gross square meters (gsm), an alteration
of an existing dental clinic of approximately 521 gsm, and an
ambulance shelter of approximately 70 gsm." Lines 6 and 7 are corrected
to read, "Project includes demolition of substandard buildings and
associated hazardous materials removal in several of the buildings. The
estimated construction cost of this project is between $10 and $25
million dollars. 3. SELECTION CRITERIA. Lines 3, 4, 5, and 9 are
corrected to read "Criteria "A" through "F" are primary. Criteria "G"
through "H" are secondary and will only be used as "tie-breakers" among
technically equal firms. A. Specialized experience and technical
competence of the firm and consultants in: (1)Design of new medical and
dental facilities and alterations to medical and dental facilities. B.
Qualified professional personnel in the following key disciplines:
Project Management; Medical Facility Planning; Architecture;
Mechanical; Electrical; Fire Protection; Structural, Civil,and
Communication Engineering; Cost Estimating; Industrial Hygienist;
Medical Equipment Planning; Interior Design; Operation and Maintenance
Systems. 4. SUBMISSION REQUIREMENTS. Add after line 9, "In Block 10,
indicate the estimated percentage of involvement of each firm on the
proposed team. See Note 26. Posted 07/28/98 (W-SN229518). (0209) Loren Data Corp. http://www.ld.com (SYN# 0015 19980730\C-0001.SOL)