COMMERCE BUSINESS DAILY ISSUE OF JULY 30,1998 PSA#2148PIP # 9 PROPOSER INFORMATION PACKET Broad Agency Announcement
SP0500-97-BAA01, Amendment #2. ADDENDUM # 9 For the United States
Marine Corps Logistics Bases (MCLBs) in Albany, GA; Barstow, CA and
Blount Island Command, FL. By the use of Broad Agency Announcement
(BAA) SP0500-97-BAA01, Amendment 02, Addendum 09, the Defense
Industrial Supply Center (DISC) is seeking industry assistance in the
reengineering of the methods by which DISC, as an Inventory Control
Point (ICP) within the Defense Logistics Agency (DLA), will provide
logistics support to its military customers. This initiative is
referred to as the DISC Industrial Prime Vendor Program (DISC-IPVP).
Addendum No. 9 is a request for the submission of Concepts for
innovative methods for DISC to provide the full breadth of Customer
Oriented Supply Chain Management (COSCM) with respect to the spare
parts and industrial hardware requirements of the United States Marine
Corps Logistics Bases located at Albany, GA, (MCLB Albany), at
Barstow, CA (MCLB Barstow),and at Blount Island Command, FL (BIC, FL).
This announcement is an expression of interest only and does not
commit the Government to make any award or to pay for any response
preparation costs. PLEASE NOTE THAT, IN 1999, DISC WILL BE INTEGRATED
WITH DEFENSE SUPPLY CENTER, PHILADELPHIA (DSCP). ANY REFERENCE HEREIN
TO DISC MEANS "DISC" OR ITS SUCCESSOR, "DSCP". DISC does not anticipate
issuing a formal Request for Proposal (RFP) or any solicitation
document issued in conjunction with this BAA. Prospective offerors are
cautioned that only the Contracting Officer is legally authorized to
commit the Government. The cognizant contracting activity is the
Defense Industrial Supply Center (DISC). The Contracting Officer is:
Tom Pawlowski, DISC-APG Defense Industrial Supply Center 700 Robbins
Ave. Phila., PA 19111-5096 Phone #: 215-697-0961 Facsimile:
215-697-3630 E-mail: tpawlowski@disc.dla.mil This Proposer Information
Packet (PIP), together with the sources of information listed below,
constitute the entire Broad Agency Announcement, and should be
consulted, reviewed or referred to, in conjunction with each other. A.
Data Bases: On the World Wide Web, at HYPERLINK,
http://www.disc.dla.mil under Broad Agency Announcement. See BAA01,
Amendment No.2, Addendum No.9. 1. Blount Island, FL: Data provided by
U.S. Marine Corps Blount Island, reflecting annual demand/usage and
descriptive data on SKCs for its site. 2. DISC provided database of
MCLBs historical demand/usage for the past nineteen (19) months for
DISC managed items, and also for items managed by DLA Inventory Control
Points other than DISC. B. Broad Agency Announcement (BAA)
SPO500-97-BAA01, Amendment 2, Addendum 9, Parts Supplier/Parts
Integrator. Note: Requests for information only may be directed to
Garth McBride (215) 697-3458, Andre McKenzie (215) 697-9785, Mindy
Guida (215) 697-1154 or Ruth Barnett (215) 697-9228. 1. PROGRAM
OBJECTIVES DISC is seeking from industry, the submission of Concepts
that will incorporate into the logistics supportsystems of MCLB Albany,
MCLB Barstow and BIC innovative and efficient methods of supply chain
management currently being employed in the commercial market place.
DISC is seeking concepts that will take those commercial processes and
design them to replace or adapt the current in-place systems, to make
them more efficient. The term "innovative" means by which the
involvement of Marine Corps, DISC, DLA and DOD infrastructure in the
supply chain will be significantly reduced or eliminated. In this
endeavor, the successful contractor, DISC and the Marine Corps
customers will form a strategic alliance whereby the use of a third
party parts supplier/parts integrator (an Industrial Prime Vendor) will
allow all parties to capitalize on the successful supply chain
management processes currently being demonstrated in the private
sector. DISC anticipates awarding a contract for a single integrator
for the logistics support of the two (2) MCLBs and BIC. As a single
source of supply, in addition to the providing of spare parts and
industrial hardware, the successful contractor will be expected to
provide inventory control and supply maintenance, planning and
forecasting, engineering and technical services, as well as surge and
sustainment. In addition, the successful contractor will be required to
maintain the supply chain system, together with information technology
that will be seamless to the Marine Corps, will eliminate
redundancies, will simplify procedures, and will provide for overall
efficiency so as to reduce the total logistics cost and reduce the time
required for the MCLBs and BIC to accomplish their respective missions.
The contractual vehicle in which DISC proposes to use for this
initiative is a firm fixed price or fixed price with economic price
adjustment Indefinite Quantity Contract (IQC) having a base period of
two (2) years and three (3) one-year options to extend the contract
term. The maximum term of the contract will not exceed five (5) years.
Each contract year, whether in the base period or an option year, will
have a specific dollar amount guaranteed. To the maximum extent
practicable, the contract will be structured in accordance with Part 12
of the Defense Federal Acquisition Regulation Supplement (DFARS).
Specific modifications or revisions to the suggested provisions of
those regulations, referred to as tailoring, as well as other
provisions unique to government acquisition, will be implemented by an
appropriate Addendum. II. CURRENT PROCEDURES NOTE: Prospective vendors
should review the following information as baseline conditions from
which to formulate improved logistical solutions. Vendors should
determine the most efficient solution possible to enable the customers
to perform their missions. A. MCLBs Albany, GA and Barstow, CA There
are 283 weapon systems maintained at MCLB Albany, some examples are:
LAV, M88, AAV, M1A1, and HMMWV. There are 285 weapon systems maintained
at MCLB Barstow, some examples are LAV, M88, AAV, M1A1, HMMWV and M109.
At MCLBs Albany and Barstow a typical LSS or PEB/BS area consists of
unattended open bins. Generally, the bins are located on shelving.
However, some items may be stacked on pallets. Mechanics draw needed
quantities of parts from the LSS or PEB/BS location and indicate on
their "inventory lists" the source or sources of the part(s) (i.e. LSS
or PEB/BS area). If part(s) is/are not available in the LSS, PEB/BS
area(s), mechanic "orders" it through "Shop Stores". If required
part(s) is/are not available from Shop Stores, the Shop Stores
initiates the acquisition process. LSS, PEB/BS locations are routinely
replenished through the Shop Stores. Replenishment of Shop Stores is
accomplished through the normal DOD MILSTRIP system. Priority
backordered supplies, when received by Shop Stores, are hand carried by
Shop Stores personnel to the mechanic. B. BIC Jacksonville, FL At
Blount Island Command there are 609 major end item systems for which
this facility assists in providing material and/or maintenance such as:
AAV, LAV, HMMWV, SINCGARS and M60. When technicians at Blount Island
Command require normal repair items they provide a written request to
the person who attends the PEB/BS area storeroom. The storeroom
attendant then withdraws the requested material from the shelved bins
in the PEB/BS area and issues it to the mechanic. The issue is then
input into a computerized database to keep record of the transaction.
The SKCs are basically maintained and provided for in the same manner.
An inventory on the SKC is conducted and an Equipment Repair Order
(ERO) is assigned for shortages. The attendant receives the ERO of
items that are to be provided in the SKCs and withdraws these items
from the storeroom area. He then places them into the SKCs. Items that
are not available from the PEB/BS are ordered through the DOD MILSTRIP
requisition system. On incoming material the government requisition
number and the ERO are used to identify it to a specific SKC upon its
arrival. When 100% of all shortages or as close to 100% as possible
(during deployment) are identified and remedied, the SKC is closed. SKC
is then placed in containers or placed on vehicles as a mobile load for
embarkation to the ship. These issues are also input into the
computerized database to keep record of the transactions. NOTE: There
is a two week period from time of ship arrival for a complete
refurnishment, assembly and reloading of contents for ship debarkation.
III. EXPECTATIONS A. The customers have the following expectations for
this initiative: 1. A Prime Vendor who acts as a parts supplier/parts
integrator in supplying and managing all parts (all items must conform
to specifications, standards, quality conformance, quality
certifications, identification and shelf life requirements as defined
by the Purchase Item Description (PID) (including all applicable
drawings); 2. A total supply chain manager of integrated logistics that
participates in all planning meetings and provides: a. 100% supply
availability; b. Pricing and Material cross-referenced to MILSTRIP NSN
by PN and technical data (prior to on-site inventory placement). c.
Forecasting and tracking of material demand/usage and associated
reports. d. Engineering and technical services, and configuration
control; e. On-site positioning, replenishment, management of material
and storage bins. f. Billing on the basis of usage, rather than at
time of bin replenishment. g. Provide initial stock based upon
historical demand with adjustments to stock based upon real time usage.
h. Material warranties i. 24 hour emergency delivery j. Kitting
services (initially required for BIC) 3. Surge and sustainment
capability; all Deployed Support Units (Maritime Prepositioned Ships)
are to be supported at all times; 4. Implementation of information
technology that interfaces with organic information systems in a
transparent manner. 5. A seamless system, elimination of redundancy and
simplification of procedures; 6. Quality parts equal to or greater than
those currently provided; 7. Reduction in contract prices in each
option year as productivity efficiencies are achieved; 8. Easy access
to a customer service representative. It is anticipated that adopting
this program will result in the reduction of total logistics costs, a
seamless system, elimination of redundancy and simplification of
current procedures and a reduction in the time required to accomplish
the customer's maintenance and overhaul mission. The MCLBs and BIC
consider this program as a viable means of building a lean, responsive
organization which manages services vice material and replaces mass
with timely information, knowledge and speed. The scope of the contract
will include a requirement that the Contractor supply related items
that have not been identified as LSS, PEB/BS, or SKCs at the date of
contract, but which are required by the MCLBs or BIC to accomplish
their respective missions. We invite Concept Papers that take advantage
of state-of-the-art technology and innovative contracting to achieve
these goals. CUSTOMER SITE VISIT Site Visits are tentatively scheduled
as follows: MCLB BARSTOW, CA: AUGUST 13, 1998 MCLB ALBANY, GA: AUGUST
18, 1998 BIC, FL: AUGUST 20, 1998 In the event that the above
mentioned dates must be changed, notice of the change will be
publicized via an Amendment on the World Wide Web, and in the Commerce
Business Daily. While attendance at the above sites is not mandatory,
the site visits are for the specific purposes of providing each
prospective vendor as much available information as possible for the
preparation of a Concept Paper. Each site visit will consist of a tour
of the facility, and will accord all who attend the opportunity to
review the types of the materials required, the number and location of
the bins, the types of weapons systems for which the parts are
required, and the general layout of each facility. All prospective
attendees must register with the contracting officer no later than
AUGUST 10, 1998. Failure to register might preclude entrance to a site.
Visitors may ask questions for the purpose of clarifying customer
support needs. However, there will be no discussion regarding
contractual content or agreements. IV. SUBMISSION PROCESS The
administrative cutoff date for submission of Concept Papers is 14
September 1998 at 1:00 P.M. Eastern Standard Time (EST). Concept Papers
received on or before that date will be evaluated for utilization at
the Marine Corps Logistic Bases and BIC. Concept Papers received
subsequent to that date may be evaluated for feasibility or utilization
at other sites. If a Concept is received late and is not evaluated for
utilization at the MCLBs, the Proposer will be notified. The BAA
number should be used on all correspondence regarding Concept Papers.
A Concept Paper should outline, describe and otherwise explain the
vendor's approach to support this initiative and the manner in which it
will maintain sources, manufacturers, producers and other suppliers
available for furnishing of these spare parts and others services in
case of a nation emergency and to achieve industrial mobilization in
time of war, international turmoil, and any anticipated surges in
requirements. The offeror may submit a phase in schedule in their
Concept Papers. All Concept Papers will be reviewed by Government
officials only and will be treated as proprietary data. Concept Papers
submitted by FAX, E-MAIL or other electronic medium will not be
accepted. Oral presentations may be required to clarify concept
submitted. In addition to offerors addressing their technical approach
to achieving the program objectives outlined in Section 1 of this BAA,
each offeror must address the information as requested within the
technical factors as listed in Section V below. Concept Papers shall
not exceed fifty (50) pages. Proposers are to submit an original and
four (4) copies of their Concept Paper (in hardcopy) and one copy of
the concept Paper, on a 3 1/2" disc, in MICROSOFT OFFICE format to the
following address: Defense Industrial Supply Center ATTN: DISC-PODP
(Bid Opening Officer) 700 Robbins Ave. Philadelphia, PA 19111-5096 DISC
intends to award a contract to a single integrator for the logistics
support of the two (2) MCLBs and BIC unless a determination can be made
that employing more than one integrator can attain the overall purpose
of this Addendum to the BAA. Concepts that support all three sites are
preferred, however at a minimum, a concept must propose support to both
the Albany and Barstow MCLBs; a failure to do so may preclude
consideration for this initiative. Strategic alliances and partnering
arrangements among suppliers are encouraged. The Government reserves
the right to select for award all, some or none of the responses
received. Any award(s) made as a result of responses received may be
made to: (1) all three customer sites combined, (2) Albany and Barstow
only, or (3) all three sites separately. V. EVALUATION PROCESS &
EVALUATION FACTORS Concepts will be evaluated on their breadth of
innovative and efficient supply chain management with respect to
support of the spare parts and industrial hardware requirements of the
MCLBs at Albany GA, Barstow CA, and the Blount Island Command, FL
relating to their respective maintenance, overhaul and repair and
logistics support missions. In addition to providing for the furnishing
of the required supplies, the COSCM Concept must demonstrate and
describe in detail the elements of inventory control and supply
maintenance, planning and forecasting, engineering and technical
services, as well as surge and sustainment. The items of supply must
conform to specifications and standards, quality conformance and
quality certifications, identification of shelf-life requirements, and
all other requirements of the specific item descriptions for the
specific parts associated with maintenance, overhaul and repair of land
vehicles at the cited MCLBs and the logistic support mission of BIC.
The COSCM concept must include a process and a time by which a 100
percent fill-rate will be achieved. A "100 percent fill-rate" means
that a specific, needed, part, set, kit, chest, etc., is available for
use when the Marine Corps mechanic or artisan attempts to retrieve it
to accomplish his of her mission. The Concept should include
innovation and efficiencies of supply chain management currently being
employed in the commercial market place, and should reflect how those
processes will be designed to replace, or be adapted to, the current
supply chain management process in place at the MCLBs and BIC. A.
Evaluation Process Concept Papers will be evaluated solely against the
criteria set forth in this BAA. Therefore, Concept Papers will NOT be
evaluated against each other since they are not submitted with a
common work statement. Concept Papers submitted shall be evaluated
against the established criteria and if deemed to have merit, the
Government will ask offeror(s) to submit proposal(s) for subsequent
negotiations for possible contract award. The format for Concept Papers
appears in part VI of this document. Concept Papers will be selected
for further discussions based upon technical merit, importance to
agency programs, and funding availability. When the Concept Paper
evaluation is completed, the submitter will be notified whether their
submission warrants further discussions with the intent of making a
contract award. All Concept Papers will be considered proprietary. All
responsible sources capable of satisfying the Government's needs may
submit a Concept Paper which shall be considered by DISC. Upon
submission of Concept Papers on 14 September 1998, only pricing
methodology should be submitted. Firm(s) who submit concept(s) that
is/are selected for full discussion, shall provide a complete pricing
proposal during negotiations. Those proposals committed to cost control
and cost management will be considered more favorably. Customer
affordability and cost/price realism are also important factors. The
final award decision will then reflect an integrated analysis of
expected outcomes and the price to achieve these results. We are
requesting a cost management plan showing the methods and amounts of
savings on an annual basis. Note: The contractual vehicle in which DISC
proposes to use for this initiative is a firm fixed price or fixed
price with economic price adjustment Indefinite Quantity Contract (IQC)
having a base period of two (2) years and three (3) one-year options to
extend the contract term. B. Evaluation Factors Specific Information --
The offeror shall fully address in the Concept Paper each of the
following areas that will be examined as part of the evaluation
process. The factors are listed in descending order of importance. 1.
Customer Oriented Supply Chain Management The Government will evaluate
the concept for its ability to provide supplies, efficient supply
chain management, inventory control, on-site stock Posted 07/28/98
(W-SN229026). Loren Data Corp. http://www.ld.com (SYN# 0610 19980730\SP-0002.MSC)
SP - Special Notices Index Page
|
|