21045-0701 Y -- NEW CONSTRUCTION OWNED DESIGN/BUILD -- ELKINS PARK MAIN OFFICE,
ASHBOURNE RD & PENROSE RD, ELKINS PARK PA 19027-9998 SOL RFP
#232098-98-A-0093 DUE 082898 POC Hekima Wallace, Facilities Contract
Specialist (410) 997-6254 and Richard Rohrbaugh, Project Manager (410)
997-6223 E-MAIL: click here to contact issuing office,
hwallac1@email.usps.gov. Design/Build an approx. 20,500 sq. ft. Postal
Facility. A drawing, specification and disk package will be furnished.
The scope of work is to complete design/engineering from 30% complete
to 100% and to construct a new building on a 5.6 acre site. Work
includes a retail store, workroom, loading dock and equipment, support
areas and covered carrier parking. The building will be constructed
using a steel frame, masonry walls, concrete slab on grade, roof
system, metal stud and gypsum board interior partitions and acoustical
ceilings. Complete plumbing, HVAC and electrical systems will include
roof tip units, power, lighting and alarm systems, two security camera
systems and fully sprinkled and fire protection systems as required by
local code and USPS requirements. Also included in the development of
the 5.6 acre site is parking for customers, employees, postal
vehicles, loading dock maneuvering area, mail drop box area and
complete landscaping, fencing storm water management systems, site
development includes paying/obtaining all permits to tap connections
and utility connections/development. Offeror must have a minimum of
five (5) years experience as a design/build contractor and must have
satisfactorily completed at least five (5) projects of similar size and
scope. Other requirements include the following: (1) Successful
completion and favorable references for similar projects; (2) Financial
stability. The proposals will be evaluated in the areas listed in
descending order of importance: (1) technical and managment proposal,
(2) cost/price, (3) previous experience, (4) references, (5) financial
stability. One entity performs both architecture-engineering and
construction under one single contract providing single source
responsibility for delivering the project design and construction. The
successful offeror will be responsible for the design (utilizing USPS
MSBD software and AutoCadd 12) and construction of the Elkins Park
Main Office, 19027-9998 under the one contract, subject to USPS
inspection. Award will be made to the offeror determined to be most
advantageous to the Postal Service. A MANADATORY Preproposal conference
has been scheduled for: August 4, 1998 @ 10:00 am at the site. The
estimated price range is between $2,750,000 and $3,250,000 with
completion required within 300 calendar days after receipt of the
Notice to Proceed. Solicitation packages will be available on or about
July 29, 1998 at $100.00 per set, NON-REFUNDABLE, from Attn: Geoffrey
Clifton, Cassway Albert LDT, 1528 Walnut St Ste 1100, Philadelphia PA
19102 (215) 545-4900 FAX: (215) 545-8222 referencing 232098-98-A-0093.
All checks/money orders must be made payable to the US Postal Service,
Disbursing Officer. Cash will not be accepted. Offers are due August
28, 1998 at 4:00 pm. Any planroom, within the project area, wishing to
receive a package free of charge, please fax or email a written
request to H. Wallace (410) 997-6260 or hwallac1@email.usps.gov A list
of planrooms and/or planholders can be received by written request
only via fax or email. No phone requests for planholders list will be
honored. OFFERS WILL NOT BE PUBLICLY OPENED. The number of offers
received, the identity of the offerors, the amount of any offer, or
relative standing of the offer WILL NOT BE DISCLOSED TO ANYONE except
those postal personnel whose official duties require such information
until award of contract is made. THE POSTAL SERVICE RESERVES THE RIGHT
TO REJECT ANY OR ALL OFFERS. Posted 07/28/98 (W-SN229567). (0209) Loren Data Corp. http://www.ld.com (SYN# 0140 19980730\Y-0017.SOL)