COMMERCE BUSINESS DAILY ISSUE OF JULY 31,1998 PSA#2149Dept of Justice, Fed Prison Industries, 320 1st Street NW -- Material
Mgt Branch, Washington, DC 20534-0001 N -- DESIGN, SALES AND MARKETING, AND INSTALLATION OF OFFICE CASE
GOODS AND SEATING DUE 083198 POC John M. Carlock, (202)305-7390/7391
Fax: (202)305-7363/7365 WEB: Click here to download a copy of this
solicitation, http://www.unicor.gov/procurement/furniture/index.html.
E-MAIL: Click here to contact the Contracting Officer via,
jcarlock@central.unicor.gov. The following is a Request for Comment
(RFC), a synopsis of information for planning purposes, and does not
constitute a Request for Proposal (RFP). UNICOR, Federal Prison
Industries is seeking industry information/comments for the purpose of
soliciting and award of a single contract for the design,
installation, comprehensive sales, customer services and marketing
services for UNICOR's office furniture case goods and seating. The
scope of work proposes three levels of design service, sales and
installation, and marketing services. The scope of work of services
required are outlined as follows: (1) Contact Service -- A customer
request for assistance in design, layout, ordering, and installation of
UNICOR office case goods and seating will normally be referred to the
contractor by Marketing Services, Project Management or Program
Management. The contractor will contact the customer telephonically
within 24 hours after referral and will arrange an on-site visit, if
necessary, within the following 72 hours. During contacts with the
customer the contractor should be prepared to offer the following
contact services; Provide product literature, Demonstrate products (
UNICOR will provide product training to the contractor ), Provide
product comparisons ( requires knowledge of private sector seating and
case goods ), Provide product lead time / delivery quotations, Review
and develop product definition and selection, Provide product price
quotations, Facilitate strategic planning for design and purchase
scheduling, Provide installation service lead-time/ delivery quotation,
Provide installation price quotation, Provide design price quotation,
Interface with with UNICOR Project Management to develop a single point
of contact for project. (2) Small Project Design Service ( 5 to 30
0ffice settings ) -- The contractor will offer on-site design services
for 5 to 30 office settings of case goods, and/or seating. Services
provided will include the following; A client interview to document
requirements, Design andspecification conversion, Inventory of existing
furniture, Verification of site conditions and measurement of office
areas ( required for most customer sites ), Architectural programming,
Design concept and price quote, Furniture layout drawing and bill of
materials, Design consultation during purchasing and installation,
Price quotation. It should be recognized that UNICOR customers are not
obligated to use our installation service. Marketing this service as
a turnkey package solution to our customers should function to limit
customers choosing someone other than UNICOR, as long as the
contractor's reputation for good service remains intact. (3) Large
Project Design Service ( 31 office settings and above ). Design service
for large projects of 31 offices or above will be on a customer fee
basis and will be quoted based on an hourly rate. The contractor will
quote the design fee and installation fee as part of the initial
contact phase of the project. Large project design services will
include the following—Client interviews to document requirements,
Design and specification conversion, Inventory of existing furniture,
Verification of site conditions and site measurements, Provide
architectural programming, Initial design concept and initial cost
estimate, Design concept at 30% CID completion, Furniture floor plan
and interim cost estimate, Full graphic presentation of design at 60%
CID completion, Revision and finalization of design, (a space plan, a
bill of materials, and a cost quotation ), Purchase and installation
instructions and detail/working drawings, Final design proposal at 90%
CID completion, Design consultation during purchase and installation.
(4) Sales and Marketing Service -- UNICOR is seeking assistance in
sales and marketing of our case goods and seating lines of furniture to
Federal customers. The increased sales UNICOR is seeking would be in
addition to sales generated by our in-house sales and marketing branch.
The offeror would be required to provide a plan to explain how the
interface between UNICOR sales staff and the contractor's sales staff
would work. The contractor will develop leads and contact Federal
customers to present all UNICOR office case good and seating furniture
line as well as FPI's schedule of products on behalf of UNICOR. Sales
and marketing materials will be provided to the contractor free of
charge to assist in the sales effort. UNICOR is extremely sensitive to
negative perceptions from customers concerning the use of high
pressure sales tactics. Under no circumstances is the offeror
authorized to use the mandatory source provision as a pressure tactic.
The contractor will rely on salesmanship of features and benefits of
the product to gain and close a customer sale. Reports documenting
sales leads and orders gained will be required to be submitted weekly
to Program Management. (5) Installation Services ( all project sizes )
-- The contractor will provide installation services for customer
orders of all quantities upon referral from the Customer Service
Centeror UNICOR Project Management. These services will be customer-fee
based and will be quoted as a separate line item on the bill of
materials. These installation services do not include line haul
transportation from the UNICOR factory to the customer site or
contractor provided off- site warehouses. The cost of this
transportation is included in the UNICOR destination pricing structure.
Installation service can be generally considered to include, inside
delivery, set up, assembly, removal and disposal of trash, and warranty
repairs or replacement. Specific services included in installation
service are as follows: Site verification, including, identification of
access and staging areas and special customer needs and procedures,
Pre-installation orientation to coordinate agency requirements and work
plans, Temporary off-site warehousing of furniture and seating being
delivered from multiple factories, Relocation and placement of existing
furniture, Inside delivery and installation including coordination with
building and trade services, Product assembly, Product quality
inspection and damage documentation, Trash removal and disposal, site
clean up, and furnishings cleaning, Furniture adjustment and leveling,
user orientation, Close out of shipping and receiving documents, Punch
list development and coordination, Product repair, touch-up, and
maintenance, Product reconfiguration / relocation design and
installation. (6) Project Coordination -- During the design and
ordering phases of a case goods /seating project, the contractor will
coordinate all work through the UNICOR Marketing Consultant based in
the customers' region. After the customer actually places their order
with UNICOR, a Project Manager will be assigned as the sole point of
contact with the customer. The contractor will at that time coordinate
all phases of delivery and installation with the assigned Project
Manager. It is expected the contractor will assume a coordination role
in monitoring and tracking shipments of shipments during the line haul
so unexpected delays are avoided and the customer receives a smooth
delivery and installation transition. The contractor, however, is
prohibited from calling UNICOR factories directly, all coordination
must be done through the Project Manager. This will ensure the
integrity of the "customer sole point of contact process." The
contractor will be required to provide, at minimum, a weekly report to
the Project Manager updating installation plans, schedules and
coordinating punch list and warranty work as required. It is critical
that the contractor provides accurate and timely work order close out
documentation for billing purposes. Sign-off should be obtained on all
delivered and installed furniture with which the customer is
satisfied. At the same time a punch list should be signed by the
customer which lists all discrepancies. A final customer sign-off
should be obtained upon completion of all punch list items, indicating
the customer is completely satisfied with all furniture and seating.
The final sign-off should be sent to the Project Manager and all
factories involved. (7) Compensation Structure -- Pricing for various
fee services in this contract should be submitted in matrix form under
the headings listed. The prices in these categories may be arranged in
groupings or on a sliding scale from small to large. Sales and
Marketing, Small Project Design, Large Project Design, Installation
Services. Proposed space plans must meet the accessibility standards,
FED-STD 795 / 1988 Uniform Federal Accessibility Standards and 28
CFR-Part 36 / ADA Accessibility Guidelines. Contractors and FPI will
conduct quarterly performance evaluation/reconciliation meetings to
discuss operations and to resolve differences regarding sales and
marketing issues and for fees earned. The Senior Program Manager will
function as the Fee Determination official. FPI shall maintain a
surveillance plan to facilitate the assessment of contractor
performance and the use of performance incentives and dis-incentives,
as well as cost control measures. UNICOR Program Management will
maintain oversight of this contract. The contractor will not be
authorized to speak for UNICOR except for advising the customer on
standard price and availability of products. The contractor cannot
issue discounts or waivers and cannot commit UNICOR to performance
without prior specific authorization by the Project Manager or Program
Management. A post contract award meeting will be held to review
procedures and details relating to the performance of this contract.
UNICOR is receptive to any and all ideas or feedback that would limit
unnecessary constraining requirements, realize a cost savings, or
highlight potential technical problem areas associated with this
initiative. Comments, supportive or critical are earnestly solicited.
Comments received by industry may or may not be used to revise the
current statement of work. The government does not intend to pay for
the information solicited and will not recognize any costs associated
with the submission of the RFC. Responses to this RFC are due no later
August 31, 1998. We request all responses be written and mailed to:
UNICOR, Federal Bureau of Prisons, 320 First Street, NW, Washington, DC
20534, Attn: John Carlock (202)305-7390 fax (202)305-7363, or e-mail:
jcarlock@central.unicor.gov. Posted 07/29/98 (W-SN229908). (0210) Loren Data Corp. http://www.ld.com (SYN# 0072 19980731\N-0001.SOL)
N - Installation of Equipment Index Page
|
|