|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 11,1998 PSA#2178US Army, CECOM Acquisition Center, Fort Monmouth, New Jersey
07703-5008 A -- SUITE OF INTEGRATED RF COUNTERMEASURES (SIRFC) DUE 093098 POC
Point of Contact -- Robert Tully, Engineer, 732-427-2311 E-MAIL: Click
here to e-mail the POC, rtully@nvl.army.mil. The U.S. Army is
soliciting ITT Avionics for a sole source modification to the CECOM
Time and Materials (T&M) contract DAAB07-96-D-D602. This contract
provides engineering services in support of the Suite of Integrated RF
Countermeasures (SIRFC) program. The modification will increase the
ceiling price form $20,000,000 to $30,000,000 and increase the period
of performance from 36 months to 60 months. The efforts included under
this contract include: advanced technology insertion programs into the
SIRFC architecture; technical support for integration of the SIRFC
system into various aircraft; Electronic Countermeasures (ECM) support
for flight/ground testing against state-of-the-art air defense systems
to include developing and programming various ECM techniques against
pulse/pulse doppler/pulse compression/Continuos Wave radars; and repair
of Advanced Development and Engineering & Manufacturing Development
(EMD) hardware/software. The Government is not in possession of a Level
III drawing or technical data package to support the SIRFC hardware.
Posted 09/09/98 (D-SN247629). (0252) Loren Data Corp. http://www.ld.com (SYN# 0009 19980911\A-0009.SOL)
A - Research and Development Index Page
|
|