COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 14,1998 PSA#2179JACKSONVILLE DISTRICT OFFICE, U.S. ARMY CORPS OF ENGINEERS, P.O. BOX
4970, JACKSONVILLE, FL 32232-0019 Z -- MAINTENANCE DREDGING, 12-FOOT PROJECT, INTRACOASTAL WATERWAY, JAX
TO MIAMI, FL VICINITY OF ST. AUGUSTINE & MANTANZAS INLET; & DISPOSAL
AREA SJ-1 OFFLOADING & RECONSTRUCTION, ST JOHNS COUNTY, FLORIDA SOL
DACW17-98-B-0032 DUE 111798 POC Contract Specialist Wanda Cruz (904)
232-2083 (Site Code DACW17) Work consists of a combination of
maintenance dredging of the Intracoastal Waterway (IWW) in two separate
areas, the dredging of a shoal at the entrance to Salt Run, and the
offloading of material from the upland disposal area SJ-1 with
subsequent reconstruction of the disposal area. Contract performance
period 682 calendar days after receipt of NTP for the Base Bid portion
of work. Options A, B, C, D, E and F each will add an additional 5
calendar days to the contract performance period. The scopes of work
for each of the four project features are as follows:(1) A large shoal
area in the IWW near the St. Augustine Inlet will be dredged to a
required depth of 12 feet plus 2 feet allowable overdepth. Total
quantity to be dredged is approximately 166,000 cubic yards. The first
order of dredged material placement (approximately 136,000 cubic
yards) will be the construction of a dune and beach disposal area at
Anastasia State Park between approximately 100 feet north of DNR
monument R-135A and DNR monumentR-138A (construction of the dune shall
precede any beach fill in front of the dune). The remaining material
(approximately 30,000 cubic yards) will be placed in the designated
beach disposal area between DNR monuments R-145.1 and R-148.1.(2) A
large shoal area in the entrance to Salt Run near the St. Augustine
Inlet will be dredged to a required depth of 6 feet plus 1 foot
allowable overdepth. Total quantity to be dredged is approximately
170,000 cubic yards, which will be divided into a base bid area of
approximately 49,000 cubic yards, and six optional bid areas, 5 of
which are approximately 20,000 cubic yards each and one of
approximately 21,000 cubic yards. The first order of dredged material
placement will be to complete the design template for the designated
beach disposal area between DNR monuments R-145.1 and R-148.1. Any
remaining material will be placed oceanward of the newly constructed
dune in the designated beach disposal area between DNR monuments R-135A
and R-138A.(3) The IWW between Station 20+00 Cut SJ-59 and Station
30+00 Cut SJ-61 will be dredged to a required depth of 12 feet plus 2
feet allowable overdepth. Total quantity to be dredged is approximately
222,000 cubic yards. All dredged material will be placed in the
designated beach disposal area between DNR monuments R-200 and
R-208.(4) Approximately 765,000 cubic yards will be removed from
Disposal Area SJ-1 and will be placed in the designated beach disposal
area between DNR monuments R-200 and R-208. Upon completion of the
material offloading, the disposal area will be reconstructed to the
lines and grades as indicated in the contract P&S. Cost Estimate is
over $10 Million. Pre- Solicitation Notice will be issued on or about
03 Setp 98. Invitation DACW17-98-B-0032 will be issued on or about 20
Sept 1998. Cost of plans and specifications is $150.00. (No Refund)
Checks should be made payable to FAO USAED Jacksonville, and sent to
Jacksonville District, Corps of Engineers, P.O. Box 4970, Jacksonville,
Florida 32232-0019. Contact Wanda I.Cruz (904) 232-2083.THIS
SOLICITATION IS 100% SMALL BUSINESS SET ASIDE. THE SMALL BUSINESS SIC
IS 1629 AND THE SIZE STANDARD IS $13.5 MILLION. IN ORDER TO BE ELIGIBLE
FOR AWARD, CONTRACTORS MUST BE REGISTERED IN THE DOD'S CENTRAL
CONTRACTOR REGISTER. CONTRACTING INFORMATION FOR THE JACKSONVILLE
DISTRICT IS NOW AVAILABLE AT OUR WEB SITE:
http://www.saj.usace.army.mil/. Posted 09/10/98 (I-SN248104). (0253) Loren Data Corp. http://www.ld.com (SYN# 0160 19980914\Z-0003.SOL)