|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 16,1998 PSA#2181AFFTC/PKAA Directorate of Contracting, 5 S. Wolfe Ave., Edwards AFB, CA
93524-1185 D -- GRINNELL FIRE PROTECTION SERVICES SOL 98Q1922 POC Roxanne Wells,
805-275-7848 (fax) WEB: On-Line Acquisition Solicitation Information
System, http://afftc_pk.elan.af.mil/scripts/xindex.asp. E-MAIL: Click
e-mail link to contact the POC., roxanne.wells@edex.edwards.af.mil. The
government intends to procure the following requirement as a sole
source acquisition from Grinnel Fire Protection Systems, 835 Sharon Dr,
Westlake OH 44145: Qty 4-Workstation Hardware and operating system (to
include: ACERPOWER Series 98 Desk-top Pentium 11 233MMX CPU, 128MB
memory, 4.3 GB hard drive, CD ROM, 16 bit sound and speakers, Windows
NT version 4.0, 17" monitor, 3 year limited warranty -- 1st year on
site, 2nd and 3rd year, return to depot service); Qty 4 -- Sitewatch
8000 Software Licenses; Qty 2 -- Server Hardware, operating system and
software (to include: ACERALTOS 9100 series Server Pentium II 266MHZ
CPU, 256MB memory, 3-4.3 GB SCSII Hard Drives, 2 channel Ultrawide RAID
5 Controller, 12/24 GB DAT and software for tape backups, NT Server
version 4.0 SQL Server for NT, 14" monitor, 3 year on-site warranty);
Qty 1 -- Laser Report Printer; Qty 1 -- Tractor feed logging printer;
Qty 6-Network Controllers for Miniplex and DCP Panels; Qty 3-DCP
interface modules (2 lines permodule); Qty 1-On-site 4 day system
administration training class for up to 12 students (Grinnell will
provide workstations, training hardware and training documentation. A
suitable training room is to be provided by the Air Force); Qty 1 --
On-site 1 day training class for system operators (Grinnell will
provide training documentation. Air Force to provide operator
workstations and a suitable training room); Qty 1 -- System
engineering, configuration and setup labor; Qty 1-Database transfer
from existing TDX-6000 system to Sitewatch 8000 system; Qty 1 -- Create
graphic maps from Air Force CAD drawings and put alarm icons on maps;
Qty 1-Final system test (Grinnell will provide one technician to work
with two site knowledgeable Air Force representatives. All alarm inputs
and outputs will be tested at the field panels during non-overtime
hours.) Justification for Other Than Full and Open Competition is 10
U.S.C. 2304 (1) as implemented by FAR 6.302-1, Only One Responsible
Source and No Other Supplies will Satisfy Agency requirements. This
notice of intent is not a request for competitive proposals; however,
all responsible sources shall submit information which clearly
demonstrates their ability to provide this item. This information must
be received by the Contracting Officer within five (5) days of the
publication of this announcement. A determination by the Government not
to compete the proposed contract based upon responses to this notice is
solely within the discretion of the Government The Contracting Officer
will review responses and make a final determination at that time.
Posted 09/14/98 (W-SN249256). (0257) Loren Data Corp. http://www.ld.com (SYN# 0023 19980916\D-0007.SOL)
D - Automatic Data Processing and Telecommunication Services Index Page
|
|