Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 17,1998 PSA#2182

20 CONS/LGCC, PO Drawer 52610, Shaw AFB, SC 29152-2610

12 -- FIRE CONTROL EQUIPMENT SOL F38601-98-T0910 DUE 092498 POC SSgt Samuel A. Stewart 803-895-6009 Ext 259 WEB: Contractor assitance site, http://www.shaw.af.mil/20fw/20log/contracting/index.htm. E-MAIL: Contact SSgt Samuel A. Stewart, Stewart.samuel@shaw.af.mil. This is a combined synopsis/solicitation for commercial products/service prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. This notice constitutes the solicitation, price quotes are being requested and a written solicitation will not be issued. The solicitation incorporates provisions and clauses identified in FAR subpart 12, FAC 97-3 as required. Standard industrial classification is 3629. This Acquisition will be procured using commercial item procedures. This procurement is to furnish all labor, material, equipment and transportation, and perform all operations necessary to design, furnish and install material in order to perform the following activities. The following work scope is to replace the Fire Deluge system controllers for the Bldgs 1208 and1616. All work shall be installed in strict accordance with the National Fire Protection Association (NFPA), National Electrical Safety Code (NESC), and the National Electrical Code (NEC), latest editions.No notes or details appearing here or on the associated drawings are intended to violate these codes and they shall not be interpreted to do so. All conduits outside of the buildings shall be rigid steel above grade and at the turn-ups and schedule 40 PVC below grade. All conduits shall be installed parallel and perpendicular to the building walls. All junction boxes and covers shall be steel. All conduits inside buildings shall be electrical metallic tubing (EMT) and shall be installed parallel and perpendicular to the building walls. Only compression couplings and connectors shall be used. The Contractor shall provide, install and determine the appropriate location of all junction boxes, elbows, tees and pull boxes required to accomplish this work. Contractor shall repair any breaches in the existing walls with the material to match the existing. All conductors shall be copper and #12, as a minimum unless noted otherwise. All conduits shall include a green grounding conductor All panels shall be copper bussed with bolt-in type breakers. All panel boards, disconnects and safety switches shall be identified with engraved phenolic tags with the equipment "name", voltage and # phases. Contractor shall engineer, assemble, install, and test eight (8) Fire Deluge pump controllers with the following specifications. Installation of the controllers shall include all necessary wiring between components and controllers, including but not limited to panel tray, wire numbers, labels, and relays. Contractor shall supply all engineering design installation, programming, start-up and testing to produce an operational system and, as a minimum provide control drawings and a Sequence of Operation. Programming of the Staefa controllers shall include setting the following, as a minimum: A)Battery voltage B)System water pressure C)Run status of auxiliary Booster pump D)Water pressure setpoint for each Fire pump E)History files for above points. The controllers shall be manufactured by STEAFA or be assembled using STEAFA components. Each controller shall consist of the following items, as a minimum. 1. Staefa Controller (Smart 11 Card) with Mounting Base; Sub Panel for mounting of new controls (Contractor will have the option of using the existing panel at each Fire Pump to house the New controllers.); DC Power Supply for system sensors; System Pressure Sensor (O to 150 PSI); System Pressure Switch; 12OV/12V Control Power Transformer; 12OV/24V Control Power Transformers; Ventilation Fan; surge protector; Uninterruptible Power Supplies (UPS) 2. Four (4) each of the controllers shall include a 24Vdc Analog meter and four (4) a 12Vdc Analog meter to monitor battery voltage. Each building shall include a Radio Communications Modem Panel (24"x24"). The panel includes as a minimum a modem set, CPT, antenna, UPS and surge protector.Each building shall include a Safety pressure switch on the incoming water line.Contractor shall ensure the PC Monitoring capability is provided as follows: 1. Monitoring of Fire pump Manual/Auto switch on each Fire pump. 2. Panels will be able to monitor run status of Auxiliary Booster Pump, input to Staefa Controller.Contractor shall supply Two (2) spare Staefa Controllers (Smart 11 Card). Contractor will NOT be responsible for any of the following. 1.Any work, calibration or testing of the existing Fire or Smoke system. 2.Any work or testing of the Engines, Pumps, Piping systems or Water storage tank. 3.Supply 12OVac power to Steafa equipment. Customer supplied from existing breakers. 4.Control of existing Booster pumps. 5.Wiring or repairs of wires from Fire Panels to Pump house. Delivery is to SHAW AFB, SC. Required delivery date is 30 Days from notification. Prefer FOB Destination quote. Quotes are required by 1600 24 Sep 98. This acquisition is set aside for small business concerns. It is the responsibility of all contractors to check the web sight for posted changes. Posted 09/15/98 (W-SN249966). (0258)

Loren Data Corp. http://www.ld.com (SYN# 0143 19980917\12-0001.SOL)


12 - Fire Control Equipment Index Page