|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 17,1998 PSA#2182SOUTHWESTNAVFACENGCOM, 1220 Pacific Highway, San Diego, CA 92132-5187 Y -- BACHELOR ENLISTED QUARTERS PHASE III P-002 MCAS MIRAMAR,
CALIFORNIA SOL N68711-96-R-2296 DUE 102998 POC Anne Garrett,
Contracting Officer, (619)532-4261 WEB: CLICK HERE TO DOWNLOAD A COPY
OF THE RFP, http://www.efdswest.navfac.navy.mil. E-MAIL: CLICK HERE TO
CONTACT THE CONTRACTING OFFICER VIA,
aggarrett@efdswest.navfac.navy.mil. DESCRIPTION OF WORK -- The work
includes demolition of existing BEQ facilities and construction of new
site utilities, site improvements, and new BEQ housing and community
facilities. New BEQ's are to be three-story, walk-up, garden style
apartments. The buildings consist of various configurations of 22, 24,
34, and 36 unit buildings. Combined with this building mix will be a
mix of unit elevations, roof types, and free-standing entrances. The
predominant building materials are integral-colored concrete masonry
units (CMU) with standing seam metal roofs. The buildings are comprised
of one type of apartment or "unit." A "unit" consists of two
sleeping/living rooms with an adjoining closet/bulk storage area, a
combined dressing/lavatory/refrigerator area, and a compartmentalized
bathroom with shower stall and toilet. Each BEQ unit is provided with
a ceiling-mounted water source heat pump (WSHP) unit with individual
controls for each sleeping/living room. Clusters of BEQ buildings are
located in close proximity to several Small Community Buildings. These
serve as centralized locations for laundry, vending, and supplies as
well as central locations for domestic cold and hot water which serve
the BEQ apartment buildings. Each Small Community Building has an
exterior patio with built-in seating and BEQ grilles. Included with
this phase of the work is the Central Community Building. This building
consists of recreation rooms, vending, toilet facilities, and other
support spaces. There are buildings H43, H44, H46 and H48 and
associated subgrade preparation and landscaping, as well as Tennis
courts and associated subgrade preparation and landscaping (Additive
Bid Items). The work shall be located at the activity (MCAS Miramar),
approximately as shown. The exact location will be indicated by the
Contracting Officer. The contract is to be awarded to the responsible
offeror who submits the proposal considered most advantageous to the
Government considering Factor 1 -- Past Performance (Subfactor 1.1 --
Past performance of Prime Contractor, subfactor 1.2 -Customer
Satisfaction and subfactor 1.3 -Past Subcontracting Efforts) ; Factor
2 -- Technical Management, (Subfactor 2.1 -- Past Experience, Subfactor
2.2 -- Key Personnel, Subfactor 2.3 -- Proposed Equipment and
Materials, Subfactor 2.4 -- Phasing Plan and Subfactor 2.5 -- Recycling
Plan) and Factor 3 -- Price. When the proposal is evaluated as a whole,
Factors 1 and 2 (Past Performance and Technical Management) combined
are approximately equal to Factor 3 (Price). The importance of price
will increase if offerors in the competitive range are considered
essentially equal in terms of technical capability, or if a price is so
significantly high as to diminish the value of technical superiority to
the Government. Site Visit will be scheduled for 6 October 1998 at 9:00
a.m. at the ROICC Office, Building 2257 Marine Corps Air Station,
Miramar. Immediately following the Site Visit, a Pre-Proposal
Conference will be held at 10:00 a.m. to 12:00 p.m.Proposers who wish
to inspect the work on site and attend the Pre-Proposal Conference may
do so by contacting Charles Greenan at (619) 537-6304. For additional
information, please contact Ms. Anne Garrett at: (619) 532-4261, or
fax your inquiries to: (619) 532-2469. -This is not a public bid
opening.-The estimated cost is more than $10,000,000.00.-Firm Fixed
Price Contract.-Contract duration is approximately 540 calendar
days.-Proposals will be considered from all responsible sources.-This
project is unrestricted.-The Standard Industrial code is 1522 and the
annual size is $17 million. It is recommended that subcontracting goals
reflect a minimum goal of 40% for Small Business, 10% for Small
Disadvantaged Business and 5% for Woman Owned Small Businesses
Subcontracting effort. In accordance with FAR 5.102(a)(7), availability
of the solicitation will be limited to the electronic medium;
solicitation will be available for download free of charge via the
Internet World Wide Web at http://www.efdswest.navfac.navy.mil -- Hard
copies (paper sets) or CD-ROM of solicitation will not be provided by
the Government.-The official plan holders list will be maintained and
can be printed from the website.-All prospective offerors and plan
rooms are encouraged to register as plan holders on the website.-Plan
holders lists will not be faxed and will only be available from the
website.-Registering offerers and plan rooms must provide a complete
name, complete mailing address, area code and phone number, Offerer
type (prime contractor, subcontractor, supplier or plan room), email
address and size (large business, small business, small disadvantaged
business, woman owned small business or other).-Notification of any
changes (amendments) to the solicitation will be made on the
Internet.-It will be the contractor's responsibility to check the
website for any posted changes.-Tentative issue date is on or about 17
September 1998 with an opening/receipt date approximately 29 October
1998. Posted 09/15/98 (W-SN250184). (0258) Loren Data Corp. http://www.ld.com (SYN# 0118 19980917\Y-0009.SOL)
Y - Construction of Structures and Facilities Index Page
|
|