|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 18,1998 PSA#2183US Army Corps of Engineers, Dist New Orleans, PO Box 60267, New
Orleans, LA 70160 Y -- MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, DEEP-DRAFT
CROSSINGS, LEASE HOPPER DREDGE NUMBER 2-99 SOL DACW29-99-B-0015 DUE
112298 POC Y -- Mississippi River, Baton Rouge to the Gulf of Mexico,
Deep-Draft Crossings, Lease Hopper Dredge Number 2-99. The hopper
dredge shall be of the self-propelled trailing suction type, equipped
with two trailing suction pipes, each of which has its own dredge pump.
The dredge will primarily be used for maintenance dredging operations
in the Mississippi River, Baton Rouge to the Gulf of Mexico, LA
project, in the area known as the Mississippi River Crossings, between
New Orleans and Baton Rouge, LA. Due to anticipated shoaling rates
only dredges with a tested dredge-and-haul production rate of at least
30,000 cubic yards per day, and a tested agitation rate of at least
75,000 cubic yards per day are acceptable for use under this contract.
FIRST SPECIFICATION IS FREE OF CHARGE, ANY ADDITIONAL COPIES ARE $5.00
EACH. UNRESTRICTED. Posted 09/16/98 (W-SN250547). (0259) Loren Data Corp. http://www.ld.com (SYN# 0108 19980918\Y-0004.SOL)
Y - Construction of Structures and Facilities Index Page
|
|