COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 29,1998 PSA#2190HSC/PKO, 8005 9th St, Bldg 625, Brooks AFB, TX 78235-5353 J -- ELEVATOR MAINTENANCE/REPAIR ON BROOKS AFB SOL 99Q0117 DUE 100298
POC Lt Annette Smothers, annette.smothers@brooks.af.mil E-MAIL: Click
here to contact the contract specialist via,
annette.smothers@brooks.af.mil. This is a combined
synopsis/solicitation for commercial item prepared in accordance with
the format in FAR Subpart 12.6, as supplemented with additional
information included in this notice. This announcement constitutes the
only solicitation; proposals are being requested and a written
solicitation will not be issued. This is a Request for Quotation(RFQ)
for Solicitation #99Q0117. These solicitation documents and
incorporated provisions and clauses are those in effect through Federal
Acquisition Circular 97-7. Note 1. This award is being set-aside for
small businesses under SIC Code 7699. The standard for small businesses
is $5.0 million or less in annual receipts. Statement of Need 1.1
SCOPE. The Contractor shall provide all qualified personnel, materials,
tools, equipment, transportation, supervision, and other items
necessary to perform all operations in connection with the inspection
and complete maintenance and repair of elevators as defined in this
Statement of Need (SON). 1.2 Location. The work sites are located at
various buildings on Brooks AFB, TX. Building numbers are located on
the bid schedule below. 1.3 The contractor shall be a certified service
representative (minimum of 5 years experience) of the particular
system(s) and all work accomplished shall be in accordance with the
manufacturer's recommendations for that system and applicable Safety
and Health Standards. 1.4 Hours of Operation. All inspections and
maintenance/repairs shall be performed during normal duty hours, 7:30
a.m. to 4:15 p.m., Monday through Friday. Brooks AFB Civil Engineering
Flight shall be notified three (3) days in advance of any scheduled
testing, inspections, and maintenance. Emergency work involving other
than normal working hours shall be cleared through the Contracting
Officer. 1.5 On-Call Service. The contractor shall provide a designated
point of contact and make necessary arrangements to insure a point of
contact is available within one (1) hour after verbal notification by
Brooks AFB Civil Engineering Flight. 1.5.1 Request for on-call service
from other sources shall not be honored by the contractor. The
contractor shall refer calls to Kathe Masch, 70 CES/CECS, 536-2317
during normal duty hours and to the 70 Civil Engineering Service Call
Unit, 536-1856 after duty hours. 1.6 Inspection and Acceptance. The
office having responsibility for inspection and acceptance is the 70
Civil Engineers Squadron, Engineering Flight. The government will
evaluate the contractor's performance using this SON and an AF Form
2519, All Purpose Checklist, based on the contractor's scheduling of
elevators IAW paras 3.2 -- 3.3.1. All surveillance observations will be
recorded by the Government. When an observation indicates unacceptable
performance, the inspector will request the contractor's
representative to reperform services (IAW FAR clause 52.212-4(a)) and
to initial the observation. 1.6.1 Elevators may be added or deleted to
this SON as needed. When a building is added or deleted the
Contracting Officer or Administrator will verbally notify the
contractor followed by a modification. 1.6.2 The Government will
furnish the contractor all reasonable amounts of electricity and other
utilities necessary to perform the services required in this SON.
Mechanical equipment controls for heating, ventilation, and air
condition systems shall not be adjusted by the contractor's employees.
2. Service Ticket. After service has been accomplished, the contractor
shall provide a service ticket containing, at a minimum: date of
service, nature of service performed, name and signature of
contractor's personnel performing service, certification of
calibration, and signature of the building manager. 3. SPECIFIC TASKS.
3.1 The contractor shall inspect, maintain, and repair elevators in
accordance with the requirements set forth in Safety Codes for
Elevators and Escalators, Inspector's Manual for Elevators and
Escalators, and manufacturer's recommendations. 3.2 Scheduling. The
contractor shall coordinate with the government Quality
AssuranceEvaluator (QAE) and the building manager when scheduling
maintenance and repair operations. 3.3 Initial inspections, maintenance
shall be completed within 10 working days from the contract start date.
3.3.1 The Contractor shall perform quarterly, semi-annual and annual
inspections as required in the ANSI Codes 17.1 and ANSI 17.2. 3.3.2
During the initial and monthly inspections the contractor shall
thoroughly clean the entire hoistway (pit areas) of all accumulated
dirt, grease, dust and debris. 3.3.3 Repairs shall be made by the
contractor as soon as possible, but NLT 24 hours after scheduled
inspection unless otherwise authorized by the QAE. 3.3.4 The contractor
shall notify the inspector and building manager immediately of any
unsafe conditions. The contractor shall disconnect the main power
supply for the elevators, then post and "Out of Order" sign on each
applicable elevator door. 3.3.5 Job sites shall be kept neat and clean
at all times. Storage of oily rags, lubricants, paints, equipment,
etc.,on government property will not be permitted. 4.
Replacement/Repair parts. Replacement parts and materials having a
value as defined below $150.00 or less per item, per job, per service
call, shall be furnished and installed by the Contractor at no cost to
the Government. 4.1 Replacement parts and materials having a value as
defined in excess of $150.00 per item, per job, per service call,
SHALL BE SUBJECT TO APPROVAL OF THE CONTRACTING OFFICER. Such parts and
materials shall be furnished and installed at a cost to the Government
of their value as defined below. 4.2 Value shall be defined as 100% of
the item cost to the contractor from his supplier as determined by the
latest supplier's price list and exclusive of shipping cost. 4.3 The
contractor is required to furnish the inspector an itemized list
showing parts and materials needed for any repair(s) within five (5)
working days after inspection. The contractor shall provide parts that
are new or reconditioned to equal or exceed the original
manufacturer's parts and shall carry a part number. Proposals shall
include monthly amounts for the following line items. Elevator -- Bldg
110 0001 Hydraulic Passenger (SN CW14248) Elevators -- Bldg 125 0002
Passenger, Operatorless Control Montgomery (SN C12309) 0003 Passenger,
Operatorless Control Montgomery (SN C12310) 0004 Hydraulic Freight (SN
C12311) 0005 Hydraulic Freight (SN C12312) Elevator -- Bldg 150 0006
Oildraulic Passenger Dover Elevator -- Bldg 155 0007 Hydraulic Freight
Elevator -- Bldg 170 0008 Hydraulic Passenger (Westinghouse-C156)
Elevator -- Bldg 186 0009 Hydraulic Freight Elevator -- Bldg 532 0010
Oildraulic Passenger Dover (SN 25K474) Elevator -- Bldg 578 0011
Hydraulic Passenger Dover (B2696) 0012 Electric Dumbwaiter (SN 11893)
Elevator -- Bldg 1150 0013 Passenger, Dover CP-60-15, (SN 80113) 0014
Passenger, Dover CP-60-15, (SN 80120) Elevator -- Bldg 1156 0015
Hydraulic Passenger Dover A Completed Copy of Offeror Representations
and Certifications -- Commercial Items (FAR 52.212-3) Shall be included
with all offers. The following contract clauses are applicable to this
acquisition. FAR 52.212-4 Contract Terms and Conditions-Commercial
Items FAR 52.212-5 Contract Terms and Conditions Required To Implement
Statutes or Executive Orders-Commercial Items Please submit offers to
Lt Annette Smothers by email at annette.smothers@brooks.af.mil or by
fax at 210-536-6265 by Fri 2 Oct 98. Posted 09/25/98 (W-SN254609).
(0268) Loren Data Corp. http://www.ld.com (SYN# 0022 19980929\J-0008.SOL)