COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 30,1998 PSA#2191Naval Air Warfare Center TSD, Code 257, 12350 Research Parkway, Orlando
FL 32826-3275 Z -- RAISED FLOORING PRODUCT & INSTALLATION SOL N61339-98-Q-0214 DUE
101398 POC Brenda Rhodes, Purchasing Agent, 407/380/4306 This is a
combined synopsis/solicitation for commercial items prepared in
accordance with the format in Subpart 12.6, as supplemented with
additional information included in this notice. This announcement
constitutes the only solicitation; a quotation is being requested and
a written solicitation will not be issued. Solicitation
N61339-98-Q-2014 is hereby issued as a request for quotation (RFQ) and
incorporates the provisions and clauses are those in effect through
Federal Acquisition Circular 97-06. This solicitation shall be awarded
on a sole source basis to Overview Systems Inc. The Standard
Industrial Classification Code for this solicitation is 8999 and the
small business annual receipts of $5M. The following item is required:
Raised Flooring Product and Installation at Company D, Computer
Science School, Bldg 1757, Room 107, Marine Corps Air Ground Combat
Center 29 Palms, CA in accordance with statement of work. Statement of
Work (SOW). PART 1 GENERAL. 1.1 GENERAL DESCRIPTION. In connection
with installation of USMC Electronic Classrooms. In classroom 107,
accomplish the following: a. Provide and install flexible foam plastic
underlayment over the entire classroom floor area to be covered by the
raised floor or ramps. b. Provide and install 120-volt power wiring
over the underlayment. Connect the raised floor wiring cables to the
existing cable harnesses provided by you and installed by others. Each
cable harness will contain a maximum of three (3) 20-amp circuits for
a total of thirteen circuits. The new wiring cables by the flooring
contractor shall be arranged so that four new flooring power
receptacles shall be on each circuit, for a total of 35 new
receptacles. Provide grommets, junction blocks, inserts and 35-20 Amp
rated duplex receptacles in the raised floor. c. Provide and install
Category 5 data cabling starting at the future hub location at the rear
of the classroom. Extend wiring to 32 locations and terminate in 32
modular housings and 32 modular duplex RJ45 insert jacks. d. Provide
and install ramps at each of the two hall entry doors. Provide and
install handrails where shown. e. Provide and install three-inch high
raised flooring over the entire classroom. Flooring to be of
polycarbonate plastic construction in 9-inch by 9-inch modules. Provide
cutouts, grommets and inserts at each data jack, power receptacle, hole
location location in the raised floor and 6-inch by 6-inch hole at the
multimedia document storage location in back of room, as shown on the
attached layout. f. Provide and install Grey Vinyl Base Molding at
base of walls above the finished raised flooring. g. Provide and
install carpet tiles over the entire raised floor, ramps, and raised
platform top and sides and step. Carpet shall be Milliken Colorweave in
any of the following colors; 141 Sapphire Gem, 142 Opal Gem, 144 Garnet
Gem or 146 Emerald Gem. Only one color is to be used throughout the
room. Adhere to the raised floor with pressure sensitive adhesive and
to the platform and ramps with permanent carpet adhesive. h. Provide an
"As-Built" Drawing showing the location of all jacks, receptacles,
cutouts and wiring runs as installed. Deliver after floor completion to
MSgt Coward, Bldg 1757, (760) 830-4860. i. The accompanying drawing
shows the raised floor and describes the sizes and locations of items
that will be installed by others prior to raised floor installation. j.
Provide single ended power cable harnesses (pigtails) to the site,
prior to the installation of the raised floor for installation by the
Site Preparation (Electrical) Contractor. Refer to the attached Floor
Junction Box Detail for more information. 2. All work shall conform to
the latest edition of the National Electrical Code and any applicable
based regulations. 3. If any deviations are required during
installation, the accompanying diagrams shall be marked to denote these
and delivered after work completion to Mr. Ike Burr, Bldg 1130,
Facilities Management Divison, (760) 830-6654. Coordinate classroom
access and installation times with MSgt Coward, Bldg 1757, (760)
830-4860. 4. Work shall be completed by close of business on Friday, 30
October 1998. Additional B Company Work: B Company work shall be
performed in Building 1761, Room 101, Marine Corps Air Ground Combat
Center, 29 Palms, CA. The following work shall be accomplished with the
work listed above for Company D: 5. Provide and install Grey Vinyl Base
Molding at base of walls above the finished raised flooring. 6. Install
the one ramp railing already purchased for B Company raised flooring
installation. The following FAR provisions and clauses apply to this
acquisition: 52.212-1, 52.212-4 and 52.212-5. The following
subparagraphs of FAR 52.212-5(b), and DFARS addenda thereto, apply:
(6), (7), (8), (9) and (16); 252.225-7001 and 252.225-7036. A completed
copy of FAR 52.212-3, and the following DFARS addenda, must be included
with quote: 252.225-7000 and 252.225-7035. See Note 22 (forty-five days
is changed to read fifteen days). Quote is due at 4PM EST. on 13
October 1998 and may be made by FAX to (407)380-8318 (ATTN: Ms. Brenda
Rhodes). For drawings and information regarding this solicitation,
contact Ms. Brenda Rhodes at (407) 380-4306. Posted 09/26/98
(W-SN254791). (0269) Loren Data Corp. http://www.ld.com (SYN# 0096 19980930\Z-0007.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|