|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 7,1998 PSA#2196Oc-Alc/Dir Contracting/Propulsion, 3001 Staff Dr Ste 1ag81, Tinker Air
Force Base Ok 73145-3032 J -- OVERHAUL OF THE TF33 VANE & SHROUD SOL F34601-98-R-55114 DUE
112498 POC For copy, Madeline Clements/Lpdpa/[405]739-4496, For
additional information contact Madeline Clements/Lpdpa/[405]739-4496
Services, non-personal: The Contractor shall provide all labor, tools,
facilities, equipment and materials, other than those identified in
Appendix "B" as GFM, to accomplish overhaul, repair and/or
modification, test, packing, preservation and packaging, and return to
the Government in a completely serviceable condition, various items of
the TF33 Vane and Shroud. This overhaul/repair shall be accomplished in
accordance with the provisions of the Statement of Work (SOW) included
in the solitation and in accordance with the applicable technical
orders listed in that Statement of Work. A firm fixed price
requirements contract is contemplated for one year, plus four (4)
one-year options. The items and Best Estimated Quantities (BEQ)
include: The 5P3/5/9/102/103 Vane & Shroud, 1st yr 159 ea; 2nd yr 135
ea; 3rd yr 120 ea; 4th yr 124 ea and 5th yr 115 ea. The 5P7/100 Vane &
Shroud, 1st yr 475 ea; 2nd yr 400 ea; 3rd yr 363 ea; 4th yr 360 ea and
5th yr 343 ea. The 6P3/5/9/102/103 Vane & Shroud, 1st yr 155 ea; 2nd yr
126 ea; 3rd yr 114 ea; 4th yr 115 ea and 5th yr 109 ea. The 6P7/100
Vane & Shroud, 1st yr 466 ea; 2nd yr 380 ea; 3rd yr 340 ea; 4th yr 342
ea and 5th yr 326 ea. The 7P3/5/9/102/103 Vane & Shroud, 1st yr 129
ea; 2nd yr 128 ea; 3rd yr 115 ea; 4th yr 114 ea and 5th yr 111 ea. The
7P7/100 Vane & Shroud, 1st yr 390 ea; 2nd yr 385 ea; 3rd yr 344 ea;
4th yr 350 ea and 5th yr 330 ea. The 8P3/5/9/102/103 Vane & Shroud, 1st
yr 149 ea; 2nd yr 132 ea; 3rd yr 119 ea; 4th yr 119 ea and 5th yr 114
ea. The 8P7/100 Vane & Shroud, 1st yr 446 ea; 2nd yr 397 ea; 3rd yr 356
ea; 4th yr 360 ea and 5th yr 330 ea. The 10P3/5/9/11 Vane & Shroud, 1st
yr 66 ea; 2nd yr 102 ea; 3rd yr 94 ea; 4th yr 102 ea and 5th yr 97 ea.
The 10P7-100 Vane & Shroud, 1st yr 73 ea; 2nd yr 84 ea; 3rd yr 58 ea;
4th yr 50 ea and 5th yr 43 ea. The 10P102 Vane & Shroud, 1st yr 70 ea,
2nd yr 57 ea; 3rd yr 35 ea; 4th yr 17 ea and 5th yr 17 ea. The
11P3/5/9/11 Vane & Shroud, 1st yr 70 ea; 2nd yr 100 ea; 3rd yr 115 ea;
4th yr 100 ea and 5th yr 93 ea. The 11P7/100 Vane & Shroud, 1st yr 81
ea; 2nd yr 100 ea; 3rd yr 72 ea; 4th yr 61 ea and 5th yr 54 ea. The
11P102 Vane & Shroud, 1st yr 103 ea; 2nd yr 96 ea; 3rd yr 73 ea; 4th yr
51 ea and 5th yr 51 ea. The 12P3/5/9/11/103 Vane & Shroud, 1st yr 125
ea; 2nd yr 100 ea; 3rd yr 113 ea; 4th yr 122 ea and the 5th yr 113 ea.
The 12P7/100 Vane & Shroud, 1st yr 140 ea; 2nd yr 66 ea; 3rd yr 46 ea;
4th yr 41 ea and 5th yr 36 ea. The 12P102 Vane & Shroud, 1st yr 96 ea;
2nd yr 50 ea; 3rd yr 35 ea; 4th yr 33 ea and 5th yr 34 ea. The
13P3/5/9/11/102/103 Vane & Shroud, 1st yr 157 ea; 2nd yr 204 ea; 3rd yr
151 ea; 4th yr 166 ea and 5th yr 165 ea. The 13P7/100 Vane & Shroud,
1st yr 82 ea; 2nd yr 100 ea; 3rd yr 71 ea; 4th yr 62 ea and 5th yr 54
ea. The 14P3/5/9/11/102/103 Vane & Shroud, 1st yr 40 ea; 2nd yr 107 ea;
3rd yr 227 ea; 4th yr 236 ea and 5th yr 258 ea. The 14P7/100 Vane &
Shroud, 1st yr 20 ea; 2nd yr 61 ea; 3rd yr 70 ea; 4th yr 61 ea and 5th
yr51 ea. The 15P102 Vane & Shroud, 1st yr 120 ea; 2nd yr 94 ea; 3rd yr
81 ea; 4th yr 85 ea and 5th yr 86 ea. The 15P7/100 Vane & Shroud, 1st
yr 120 ea; 2nd yr 108 ea; 3rd yr 74 ea; 4th yr 64 ea and 5th yr 57 ea.
In addition to the above, there are 15 Extended Vane Replacement (EVR)
items for the N2 Vane & Shrouds. The best estimated quantities (BEQ)
for these items are minimal, not exceeding 10 per year. The N1 (low
speed) Vane & Shroud items are manufactured in halves and are approx
30.250 inched OD by 19.400 inches ID by 4.017 inches thick. The
material is AMS 5504 and 5613 corrosion and heat resistant steel. The
N2 (high speed) Vane & Shroud items are approx 27.745 inches OD by
19.333 inches ID by 2.643 inches thick. The material is AMS 5504 and
AMS 5613 corrosion and heat resistant steel. Vane and shroud feature
inner and outer shrouds connected by equally spaced vanes. The vane and
shroud directs air at an angle to compressor blades. These items shall
be repaired IAW the directions of the Statement of Work (SOW) included
in the solicitation and IAW Technical Order Series 2J-TF33-53. Briefly
the repair consists of stripping the coating, removal of air seal,
vane replacement, welding of outer shroud, recoating and reinstallation
of the air seal. The N1 Vane & Shouds must be kept together as a
matched set during the machining and shipping. There is no Government
Furnished Tooling. Deliveries are to Tinker AFB, OK. Solicitation shall
be issued to the sources which are pre-qualified on or about 14 October
1998 -- The closing date will be on or about 20 November 1998. For
QUALIFICATION PROCEDURES, please contact JOE ROOP at (405)739-7243 or
FAX (405)739-7085. For FURTHER INFORMATION, contact
OCALC/LPDPA/Madeline Clements/telephone (405)739-4496. For a COPY OF
THE SOLICITATION, please send written request to FAX (405)739-4237.
Only written or faxed requests received directly from the requestor are
acceptable. The approximate issue/response date will be 16 OCT 1998. No
telephone requests. Only written or faxed requests received directly
from the requestor are acceptable. All responsible sources solicited
may submit a bid, proposal, or quotation which shall be considered.
http://www.tinker)contracting.com/pkbizops/PKZ/LPDP/LPDP.htm Posted
10/03/98 (I-SN258177). (0276) Loren Data Corp. http://www.ld.com (SYN# 0037 19981007\J-0010.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|