|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 14,1998 PSA#2200Dept of Justice, Fed Prison Industries, 320 1st Street NW -- Material
Mgt Branch, Washington, DC 20534-0001 61 -- BATTERIES SOL 1PI-R-1169-98 DUE 101698 POC Lisabeth Day,
Contract Specialist, (202) 305-7304 or FAX (202) 305-7363 WEB: Download
copy of solicitation and amendments, www.unicor.gov/procurement.
E-MAIL: Amendment 003 to previous solicitation,
LDay@central.unicor.gov. UNICOR, Federal Prison Industries amendment
0003 for combined cbd synopsis/solicitation dated 9/4/98 on
solicitation number 1PI-R-1169-98 has been amended as follows: 1)
include special contract requirements for an economic price adjustment
(EPA). Clause shall read as "Every twelve (12) months after contract
award date, contract prices for the succeeding 12 months may be
adjusted in accordance with the change in the Producer Price Index for
Primary Metal products, Industry Code 3399, and The Employment and
Earnings Classification Code 339 ( Miscellaneous primary metal
products, from the date of award to the date of adjustment. It is the
contractor's responsibility to request this adjustment. Adjustments may
be requested for a period not to exceed 30 days after the eligible
adjustment date. Requests that are made after the 30-day limit will not
be honored and the contract pricing will not be adjusted. The
contractor shall submit any requests for adjustments in writing to the
Contracting Officer, identified in Section G. Requests shall include
a copy of the relevant index and must be within the allowed time period
for adjustment. Any adjustments authorized as a result of the
adjustment request will not be retroactive. The date the completed
request is received by the Contracting Officer will be the effective
date of any changes in price. The contractor also is required to
request downward price adjustments. All downward adjustments will be
retroactive to the authorized adjustment date as specified in this
clause. If downward price adjustments are not requested and this is
later revealed through audits or otherwise, the contractor shall
reimburse the Government the amount overcharged plus interest. Interest
will be computed at the rate set annually by the Secretary of the
Treasury for late contract payments. Interest will accrue from the date
the adjustment should have been made. In computing any contract price
adjustment, the most recently published index as of the date of award
will be compared to the most recently published index as of the date of
adjustment. No adjustment shall be made if the referenced change is
less than 2%. Total upward adjustment for the contract period shall not
exceed 10%, per year, based on the original contract price; downward
adjustment are not limited. Indices are available from the Bureau of
Labor Statistics, 600 E Street, N.W., Washington, DC 20212, telephone
(202) 606-7706. You can also retrieve this information from the
Internet at www.stats.bls.gov:80/cgi-bin/srgat. 2) Estimated maximum
quantity for line items 0008 through 0011 are 40 each. 3) Closing date
is hereby extended until 10/16/98 at 1:00 Eastern Standard Time.
Posted 10/09/98 (W-SN261110). (0282) Loren Data Corp. http://www.ld.com (SYN# 0209 19981014\61-0001.SOL)
61 - Electric Wire and Power and Distribution Equipment Index Page
|
|