Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 21,1998 PSA#2205

Officer in Charge of Construction, Naval Facilities Engineering Command, Contracts Marianas (Guam), PSC 455 Box 175, FPO 96540-2200

J -- BODY/FENDER STRUCTURE, CORROSION CONTROL & MECHANICAL REPAIRS ON CRANE SOL N62766-98-Q-9879 DUE 111798 POC Diana Chargualaf, Procurement Tech @(671) 339-3180, Lani Guzman @339-5120, Fax: (671) 339-4231 This is a Simplified Acquisition Procedure Solicitation for Body and Fender Structure, Corrosion Control and Mechanical Repairs on Crane, USN #82-04512. The contractor shall provide all labor, equipment, materials, tools, instruments, transportation and supervision necessary to provide inspection, renew batteries and move equipment to Shop crane working area, replace alternator assembly, tune up carrier engine, renew primary and secondary fuel filters, reset fuel racks and valve lash on both bands, secure all fuel lines, change carrier engine oil and filters, renew air cleaner element, flush, drain and refill carrier engine cooling system, renew coolant filter, flush, drain and refill hydraulic tank, renew hydraulic filter, drain and refill differentials (rear and intermediate), replace carrier engine throttle cable, replace steering center drag-link assembly (rusted out), replace eight (8) each front suspension stabilizer beam torsion bar fastener nuts (rusted out), put in operation hack system, altarwiring and relay, check carrier instrument panel gauges, meters and switch, repair and replace defective parts as required, drain and refill transmission oil, service all grease nipples under chassis, tune up crane engine, renew fuel filters and air cleaner element, reset fuel racks and valve lash, flush crane engine cooling system, drain and refill coolant with anti freeze solution, replace radiator upper hose elbow (rusted out), repair or replace fuel gauge on crane cab (inoperative), replace crane house with shield wiper motor, arm and blade (missing), check and repair wiring and switch, install seat belts in house operator seat, drain and refill crane transmission and final drive, lower and secure boom on the craddle, R&R, overhaul hook block, R&R main hoist clutch and brake linings, clean and deglaze linings and drums, adjust as per manufacturer's specs, R&R boom clutches and brake linings, clean and deglaze linings and drums, adjust as per manufacturer's specs, R&R both swing clutches, clean and deglaze linings and drums, adjust as per manufacturer's specs, R&R, overhaul swing brake, R&R, overhaul boom point sheaves, disconnect and separate boom point section from boom base, replace bent and rusted latties (7) each as per manufacturer's procuredure (require certified welder), prime paint repaired areas, reinstall boom point section, R&R floating gantry, disassemble and inspect sheaves, bushings and spacers for wear, repair or replace defective parts, reassemble and install, R&R lower gantry, disassemble and inspect sheaves, bushings and spacers, repair or replace defective parts, reassemble and install, inspect all wire ropes for wear, kinks and broken strands, if satisfactory, lubricate all wire ropes, replace pawl actuator on left drum, R&R, overhaul left and right front outrigger stabilizer cylinders, calibrate levels, lubricate turntable, outriggers, control levers and linkages, service all grease nipple on upper works, put in operation back up alarm, put in operation all lighting system, include flood lights, perform equipment operational test and final adjustments on mobile crane. Provide all labor, equipment, materials, tools, instruments, transportation and supervision necessary to provide inspection/write up, have certified welder inspect and certify all welds on boom sections and crane load sections, purchase and install crane operator seat belt, purchase and replace all data plates, purchase and replace crane engine housing assemblies to include doors and brackets (support), purchase and replace crane operators cab assembly to include doors, glass panels and support brackets, purchase and replace carrier operators cab assembly to include doors and glass panels, steam clean and water blast complete to remove dirt, oil and grease, descale and sand complete, chassis (under carriage) and carrier assembly, descale and san complete crane assembly, descale and sand complete boom sections, prepare complete mask all areas not to be painted on chassis, carrier, crane and boom sections, paint complete, chassis, carrier crane and boom section, to include hazard markings (black and yellow strippings), unmasking, touch up and relettering on 35 ton crane. Specifications will be available on or about 03 November 1998 and Receipt of Quotes is schedule for 17 November 1998 at 4:30 p.m. (Guam Time). This procurement is 100% set aside for small businesses. Telephone request will not be accepted. A fax number has been provided for your request of the specification. SIC Code 8999. Posted 10/18/98 (W-SN263089). (0291)

Loren Data Corp. http://www.ld.com (SYN# 0048 19981021\J-0010.SOL)


J - Maintenance, Repair and Rebuilding of Equipment Index Page