|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 19,1998 PSA#2225U.S. Army Engineer District, Alaska, Attn: CENPA-CT-CO-M, P.O. Box 898,
Anchorage, AK 99506-0898 (Physical Address: Bluff and Plum Streets,
Building 21-700 (Room 200), Elmendorf AFB, AK 99506-0898) Y -- HARBOR IMPROVEMENTS, PHASE I, ST PAUL, ALASKA SOL
DACW85-99-B-0001 DUE 010799 POC Gail M West, 907/753-2552/Contracting
Officer, Corps of Engineers Construct three 1,250 l.f. rubble mound
offshore reefs seaward of the existing breakwater. Estimated quantities
are 45,000 CY of 20 -- 500 lbs rock and 95,000 CY 1,000 -- 8,000 lbs
rock. Repairs to the existing main and detached breakwaters. Estimated
quantities of rock are 74 ea at 7,800 lbs to 18,000 lbs; 25 ea at a
minimum of 44,000 lbs; and, 2 ea at a minimum of 60,000 lbs. No
contractor's staging area will be provided at the harbor site. THIS IS
AN UNRESTRICTED PROCUREMENT UTILIZING ELECTRONIC BID SETS (EBS).
TRADITIONAL HARD COPIES OF PLANS AND SPECIFICATIONS WILL NOT BE
AVAILABLE FOR THIS PROJECT. THE OFFICIAL COPY OF THE EBS SOLICITATION
DOCUMENTS WILL BE PROVIDED ON COMPACT DISKS-READ ONLY (CD-ROM) AT NO
CHARGE. (http://ebs.poa.usace.army.mil) Range: $5,000,000 to
$10,000,000 -- FFP 300 days completion time -- SIC Code 1629. OPEN TO
LARGE AND SMALL BUSINESS.***** Posted 11/17/98 (W-SN272299). (0321) Loren Data Corp. http://www.ld.com (SYN# 0127 19981119\Y-0004.SOL)
Y - Construction of Structures and Facilities Index Page
|
|