COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 8,1998 PSA#2237National Park Service, Golden Gate National Recreation Area,
Contracting Office, Building 201, Fort Mason, San Francisco, CA 94123 54 -- FIBERGLASS PEDESTRIAN AND EQUESTRIAN BRIDGES SOL
1443RQ8140-99-0005 DUE 011499 POC Carol A. Axley (415) 561-4503 E-MAIL:
click here to contact the contracting officer via, carol_axley@nps.com.
Supplier shall furnish and deliver two fiberglas bridges to Muir Beach,
California, Golden Gate National Recreation Area. Both bridges shall be
manufactured and fully engineered as clear span bridges of fiber
reinforced plastic. ENGINEERING: One bridge with dimensions of 50" X
4"-0", shall be designed for a minimum live load of 85 per square foot,
and one bridge with dimension of 70' X 5'-0", shall be designed for a
minimum live load of 60 per square foot. The wind loading shall be
taken as 20 per square foot on an open frame type structure. DESIGN:
(1) Mounting Device: The manufacturer shall provide separate mounting
clips by the design. These clips shall be fabricated from galvanized
A36 steel to enhance corrosion resistance. Clips shall be securely
attached to the foundation as required to provide adequate vertical and
horizontal support; (2) Railing Height: Railing height shall be 42";
(3) Diagonals: Bridges shall be provided with a minimum of one diagonal
per panel. Two diagonals shall be providedas required for heavier load
conditions; (4) Bridges in excess of 20"-0" may be spliced for
shipment. MATERIALS: (1) Bridges shall be fabricated from high strength
E-glass and isophthalic resin. Weathering and ultra violet light
protection shall be provided by addition to a veil to the laminate
construction. COLOR: Bridges shall be Olive Green; (2) HARDWARE: All
hardware shall be hot dipped galvanized; (3) DECKING: Bridge #1 (50' x
4"-0") shall be standard 2" x 10" yellow pine treated according to the
American Wood Preservers Bureau; Bridge #2 (70' X 5"-0") shall be
standard 3" X 12" plank for equestrian type loading conditions.
FOUNDATIONS: (1) All information regarding bridge support reactions,
anchor bolt location and placement shall be furnished by the bridge
manufacturer; (2) All other construction design for the foundation
shall be the responsibility of the National Park Service; (3) All
procedures for installing the bridges shall be given to the NPS
personnel on site by the manufacturer. DELIVERY AND ERECTION: (1)
Delivery shall be made to Muir Beach Parking Lot, Muir Beach,
California 94965, in care of the National Park Service. (2) National
Park Service personnel shall unload the bridges from the truck at the
time of arrival. Manufacturer must notify the National Park Service in
advance of the expected time of arrival at the site. Posted 12/04/98
(W-SN277344). (0338) Loren Data Corp. http://www.ld.com (SYN# 0222 19981208\54-0001.SOL)