|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 14,1998 PSA#2241Central Alabama Veterans Health Care System (East Campus), 2400
Hospital Road, Tuskegee, AL 36083 C -- REPLACE FIRE ALARM SYSTEM, PHASE III SOL 619A4-6-99 DUE 011599
POC Paulette Z. Ingram, Contracting Officer (334/727-0550, Ext. 3518)
Provide Architect Engineering Services to verify existing conditions,
design, develop work drawings, specifications, firm estimate of
construction cost, construction period services and site visits to
Replace Fire Alarm System, Phase III at the Central Alabama Veterans
Health Care System, Tuskegee, Alabama. The estimated construction cost
range is between $250,000.00 and $500,000.00. This is a 100% Emerging
Small Business Set-Aside. Interested firms are requested to submit
updated 254's and 255's (as described in numbered Note 24) to the
Contracting Officer (90C), Logistics Management Service (90C), Central
Alabama Veterans Health Care System, 2400 Hospital Road, Tuskegee, AL
36083-5001 by the close of business January 15, 1999. This is not a
request for proposals. See Numbered Note 24. Posted 12/10/98
(W-SN279088). (0344) Loren Data Corp. http://www.ld.com (SYN# 0024 19981214\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|