|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 14,1998 PSA#2241Eldorado National Forest, 100 Forni Road, Placerville, CA 95667 Y -- RECONSTRUCTION OF SECOND FIDDLE TURNBACK ROAD SOL RFQ R5-03-99-08
DUE 021699 POC Larry Taylor, COR, 530/622-5061 or Kathryn Griffin, CO,
530/622-5061 E-MAIL: RFQ R5-03-99-88 Second Fiddle Turnback,
acquisitions/r5_eldorado@fs.fed.us. Project consists of minor to
moderate reconstruction work on 11 Timber Sale Roads. Items of work
include clearing and grubbing, excavation, reconditioning of roadbed,
placement of AC hot mix, aggregate base, Class V riprap, and borrow
material. Other items of work include installing 8" PMP underdrain,
corrugated metal pipes, steel gates, steel guardrail barricades, and
roadside ditches. There will be no Pre-Bid Meeting or Tour. Project is
located: From Placerville, travel east on US Route 50 approx. 15 miles
to the Sly Park Road turnoff. Travel south on Sly Park Road (E-16)
approx. 3 miles to the Morman Emmigrant Trail. Travel east on the
Morman Emmigrant Trail (10N50) approx. 3 miles to Bonetti Road (10N55)
turnoff (or approximately 10 miles to the North-South Road [10N83]
turnoff. Then follow the location map in the plans to each individual
road. Government Price estimate is between $25,000 and $100,000.
Estimated start work date is May 2, 1999. There is no set aside for
small business. Package willbe ready approximately 01/11/99 Posted
12/10/98 (W-SN279141). (0344) Loren Data Corp. http://www.ld.com (SYN# 0126 19981214\Y-0009.SOL)
Y - Construction of Structures and Facilities Index Page
|
|