COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 23,1998 PSA#224820 CONS/LGCV, PO Drawer 52610, Shaw AFB, SC 29152-2610 61 -- GENERATOR ASSEMBLY USED ON MFP-12A GENERATOR SET 750KW SOL
F38601-99-R0002 DUE 122298 POC Caroline Dailey or Judith Croxton (803)
895-6000 ext 234 or 230 WEB: Click here to download a copy of the
Representations,
http://www.shaw.af.mil/20fw/20log/contracting/index.htm. E-MAIL: Click
here to contact the contract administrator or,
dailey.caroline@shaw.af.mil or croxton.judith@shaw.af.mil. This is
amendment #3 to the combined synopsis/solicitation #F38601-99-R0002.
The following FAR Clause 52.211-9 Alternate I Desired and Required Time
of Delivery (Apr 1984) is hereby incorporated. 52.211-9 -- Desired and
Required Time of Delivery. (Alternate I) (APR 1984) Desired and
Required Time of Delivery (Jun 1997) (a) The Government desires
delivery to be made according to the following schedule: DESIRED
DELIVERY SCHEDULE ITEM NO. QUANTITY ON OR BEFORE 0001 5 1 FEB 99 If the
offeror is unable to meet the desired delivery schedule, it may,
without prejudicing evaluation of its offer, propose a delivery
schedule below. However, the offeror's proposed delivery schedule must
not extend the delivery period beyond the time for delivery in the
Government's required delivery schedule as follows: REQUIRED DELIVERY
SCHEDULE ITEM NO. QUANTITY ON OR BEFORE 0001 5 1 MAR 99 Offers that
propose delivery of a quantity under such terms or conditions that
delivery will not clearly fall within the applicable required delivery
period specified above, will be considered nonresponsive and rejected.
If the offeror proposes no other delivery schedule, the desired
delivery schedule above will apply. OFFEROR'S PROPOSED DELIVERY
SCHEDULE ITEM NO. QUANTITY ON OR BEFORE (b) The delivery dates or
specific periods above are based on the assumption that the Government
will make award by 30 Dec 98. Each delivery date in the delivery
schedule above will be extended by the number of calendar days after
the above date that the contract is in fact awarded. Attention is
directed to the Contract Award provision of the solicitation that
provides that a written award or acceptance of offer mailed or
otherwise furnished to the successful offeror results in a binding
contract. Therefore, the offeror shall compute the time available for
performance beginning with the actual date of award, rather than the
date the written notice of award is received from the Contracting
Officer through the ordinary mails. (End of Clause) Posted 12/21/98
(W-SN282239). (0355) Loren Data Corp. http://www.ld.com (SYN# 0242 19981223\61-0004.SOL)