|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 23,1998 PSA#2248Alliant Techsystems Incorporated, Allegany Ballistics Laboratory, P.O.
Box 210, State Route 956, Rocket Center, WV 26726 Y -- RENOVATION OF 1200 SQ. FT. BUILDING SOL PHC-262 POC Patrick H.
Cunningham, 304-726-5047 The work consists of general renovation to a
1200 square foot concrete building with a 30 foot ceiling. Renovations
to include: a new roof, a new roll up overhead door, outdoor cable
tray, overhead crane renovation, removal of bulkhead, and cosmetic
repairs. General installation includes new power transformer and
distribution, HVAC telecommunications and control instrumentation, wire
and cable. Estimate cost of the project is between $100,000 and
$250,000. Bid date is not firm, but will be approximately March 10,
1999. Bonds will be required. Term of the subcontract will be 100
calendar days. West Virginia Contractor License must be submitted prior
to commencement of work by Contractor and all subcontractors. In order
to obtain plans and specifications, please submit a $35 non-refundable
fee payable to Alliant Techsystems with a written request. Alliant
reserves the right to refuse written requests on/after February 5,
1999, Posted 12/21/98 (W-SN282381). (0355) Loren Data Corp. http://www.ld.com (SYN# 0085 19981223\Y-0004.SOL)
Y - Construction of Structures and Facilities Index Page
|
|