COMMERCE BUSINESS DAILY ISSUE OF JANUARY 4,1999 PSA#2254314th Contracting Squadron, 642 Thomas Avenue, Little Rock AFB, AR
72099-5019 Z -- REPAIR FUEL TRANSFER STATIONS SOL F03602 99 R0001 POC Sammy
Moncada (501) 987 3848/ Berry Junt (501) 987 3853/ Contracting Officer
Ray Blevins (501) 987 3379 The intent of this notice is to ammend the
solicitation number of this procurement from F03602 98 R0016 (posted
on the CBD on or about 25 November 1998) to F03602 99 R0001. The
revised proposed RFP issued date has change to or about 1 February
1999. All other information remain the same. The principles features of
work for project NKAK 96-1034 include, but are not limited to: (1)
Restore two bulk fuel stations and off loading headers to active
service. (2) Stations #1350 function is to transfer JP-4 from bulk to
the flightline fuel pump stations. (3) Modifications are required to
reconnect bulk fuel storage tank #1 (facility #1348). Station #1346 is
used to load and /or unload fuel trucks in conjuction with the off
loading headers. (4) This project will refurbish portions of the
facilities that are now old and/or defunct. (5) Modifications to pump
station #1350 include remiving inactive pumps, valves, and piping that
is used to transfer JP-4 from tank #1348 to flight line. (6) Supply
pipe from tank #1 willbe reconnected to active pumps at pump station
#1350 and provided with appropiate isolation valves. (7) Modifications
to pump station #1346 include retrofitting two filter separator
vessels with all new equipment and accesories including new flow
control valves (40 AF-2C)and isolation plugs valves. (8) Modifications
to the bottom loading fillstand #1 include installing a new fuel flow
meter, isolation plug valves, flow control selenoid valve, electrical
deadman control (including controller, switch, wiring and conduit),
flexible hose, and truck nozzle. (9) Bottomloading fillstand #2 will
have the flow control solenoid valve and electrical deadman control
(including controller, switch, wiring and conduit)added. The estimated
cost of constructionis between $100,000.00 to $250,000.00. The
performance period for the project will be 120 calendar days. This
procurement is being issued on an unrestricted basis with small
disadvantaged business evaluation preference. Contract award will be
determined by using thenewly drafted Air Force Basic Source Selection
Procedures. Only written request for solicitation packages will be
accepted.**** Posted 12/30/98 (W-SN284215). (0364) Loren Data Corp. http://www.ld.com (SYN# 0089 19990104\Z-0021.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|