Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 7,1999 PSA#2257

Munitions Contracting Division (AFRL/MNK), Building 13, 101 West Eglin Boulevard, Suite 337, Eglin AFB, FL 32542-6810

A -- MISSILE CONTROL TECHNOLOGY (MCT) SOL PRDA MNK- 99-003 POC Contact Jeff Duval, Contract Specialist, at (850) 882-4294, ext. 3207, or Lorna Tedder, Contracting Officer, at (850) 882-4294, ext. 3399 E-MAIL: Jeff Duval, Contract Specialist; William Jones, Program, duvalj@eglin.af.mil">duvalj@eglin.af.mil;jonesw@eglin.af.mil. CORRECTION: This synopsis is being issued in response to Industry Day comments to Synopsis MNK 99-008, Missile Control Technology (MCT), published in the Commerce Business Daily on 21 December 1998. The original due date for proposal submittal, 4 February 1999, is not impacted as a result of this amendment. The period of performance for the two phases is changed to ten (10) months for Phase I and twenty (20) months for Phase II. As a result, the following additional requirements are added to the MCT Program: (1) Item (f) is added to PHASE II FLIGHT CONTROL SYSTEM DESIGN AND DEVELOPMENT (OPTION), as follows: (f) Explore and analyze potential main motor design issues and constraints, including the impact of parameters such as propellant formulation, propellant slope, motor case design, motor operating pressures, etc. in order to optimize the performance of the overall system. (2) The following requirements are added to REVIEWS: Phase I requires an informal status review 6 months after contract start and a final program review at the completion of the effort. Each review will summarize all technical, programmatic and cost issues pertinent to this project. Phase II reviews shall be timed to coincide with major test activities to allow government review of pretest designs and test execution. (3) The requirement for a pitch plane valve is added to TECHNICAL GOALS, item (b) as follows: (b) not less than 800-1000 pounds thrust from an individually open pitch plane valve. (4) TECHNICAL GOALS, item (h) is changed to read: (h) maximum operating time of not less than 4 seconds continuous operation. Baseline phase I designs shall be configured to bleed chamber pressure gas from the blast tube area of a standard rocket motor. The final placement of the RJC system is pending overall system trades. (5) The overall funding levels remain the same, however the maximum amount for each Phase I contract is anticipated to be $600,000. (6) The phone number for Ms. J. Duval, contract specialist is changed to (850) 882-4294, ext. 3207. Further questions should be directed to Mr. William J. Jones (technical) at (850) 882-2220, ext. 3331, (FAX (850) 882-4793, email: jonesw@eglin.af.mil, AFRL/MNAV, 101 W. Eglin Blvd, Ste 329, Eglin AFB, Fl, 32542-6810; or for contract issues, contact Ms. Lorna E. Tedder, Contracting Officer, (850) 882-4294, ext. 3399, email: tedder@eglin.af.mil, or Ms. Jeff Duval, Contract Specialist, (850) 882-4294, email: duvalj@eglin.af.mil, ext. 3207, (FAX 850-882-9599), at 101 W. Eglin Blvd, Ste 337, Eglin AFB, Fl 32542-6810. Posted 01/05/99 (W-SN284966). (0005)

Loren Data Corp. http://www.ld.com (SYN# 0004 19990107\A-0004.SOL)


A - Research and Development Index Page