COMMERCE BUSINESS DAILY ISSUE OF JANUARY 25,1999 PSA#2268Department of the Treasury, U.S. Secret Service, Procurement Division,
1310 L Street, Room 730, Washington, DC, 20223 D -- INSTALL SYSTEM IN MINNEAPOLIS OFFICE SOL 99-q-015 DUE 012699 POC
Patricia Kiely, Contracting Officer, Phone (202) 435-6940, Fax (202)
435-7138, Email none -- Patricia Kiely, Contracting Officer, Phone
(202) 435-6940, Fax (202) 435-7138, Email none WEB: Visit this URL for
the latest information about this,
http://eps.arnet.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=99-q-015&Lo
cID=38. E-MAIL: Patricia Kiely, none. This is Amendment number #2 to
the original synopsis posted January 15, 1999 and amendment number #1
posted January 20, 1999. The following provides the questions along
with the responses: (1) (1) Is the building new or existing? This is a
new Federal Courthouse.(2) Are there Drop (T-bar) ceilings? Removable
drop ceilings.(3) Who is the local Telco Vendor? The local telephone
vendor is US West Communications. General Services Technology Service
is the vendor for the telephone lines currently used in the office.(4)
When can access to the building be possible? January 21, 1999(5) What
is the application for the teflon cable? Forced Air Return -- Cable
must be teflon, fire retardant cable, to be run in the ceiling. Cable
must meet fire code regulation. (6) Is plenum cable required for the
voice and data runs? Yes (7) What type of jacks are required and what
is the termination, patch panel or 66 block? The jack requirement for
telephones RJ11C and data jack requirement is RJ145S. Telephone
termination on M66 blocks. Data terminate on level 5 patch level.(8)
When will the lines be brought to the office? Confirmation of the
actual move date is unknown at this time. Approximate move date is Feb
8, 1999.(9) Is the system to be rack or wall mounted? Is there or will
there be backboard in place? System is to be wall mounted. Backboard is
installed. (10) Where is the 21X located? Within USSS space. (11) Is
there a dedicated circuit for the telephone system? The telephone
system will have 7 centrex telephone and 4 DID trunks. (12) What is
required on the building permit? Who's the point of contact. The City
Building Permit is required for any contractor working in the New
Federal Courthouse. All vendors must contact the City of Minneapolis to
acquire the permit. There are specific qualifications and information
that must be provided to insure general liability coverage.
Certification on installation, programming, and training on NEC
Professional II Telephone System is required. All other terms and
conditions of theoriginal synopsis and amendment remain in full force
and effect. Posted 01/21/99 (D-SN290175). (0021) Loren Data Corp. http://www.ld.com (SYN# 0023 19990125\D-0002.SOL)