Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 28,1999 PSA#2271

55 Contracting Squadron/LGCS 101 Washington Sq., Offutt AFB, NE 68113-2107

D -- DISASSEMBLY, REMOVAL, AND ACQUISITION OF TWO MAINFRAME COMPUTERS SOL 99Q5141 DUE 021099 POC Frank E. Keuchel, 2Lt, (402) 294-4098 E-MAIL: Click here to contact the contracting representative, Frank.Keuchel@offutt.af.mil. The 55th Contracting Squadron at Offutt AFB, NE, wishes to locate a vendor to disassemble, remove, and take ownership of two large mainframe computers, IBM 9021-900 and IBM 9021-720, at the U.S. Strategic Command. A site visit will be held on 16 Feb 99 at 1:00 P.M. for prospective bidders. Due to the nature of this activity, attendance at the site visit is mandatory if a vendor wishes to submit a proposal. Parties interested in attending the site visit shall contact the office below by 10 Feb 99. This visit will take place at the LeMay Building, Offutt AFB, NE. Inventories and weights of each of the systems components will be provided at the site visit. The systems have been serviced to the point that power has been turned off to all units and the chilled water valves closest to the supply manifolds have been closed. Please submit proposals to arrive at the office below not later than COB 1 Mar 99. The contractor must provide all equipment, labor, and materials to remove and dispose of the computer systems, and to accomplish the following objectives: 1) Remove 157 disk spindles from the Head Disk Assemblies (HDAs) in the Direct Access Storage Devices (DASD) and return them to the Government. A Government employee will observe this removal and subsequently take possession of the spindles for security reasons. 2) Remove and take possession and ownership of the IBM 9021-900 and IBM 9021-720 mainframe computers. 3) Take necessary precautions to ensure no damage is done to the facility during removal of the equipment. 4) Ensure all areas in which equipment is removed or moved through are returned to their original condition, including painting, and replacement of tiles if necessary. Please Note: Removal of cables from beneath the sub-floor is not part of this initiative. After the site visit is conducted, prospective vendors will submit a proposal. This shall include a technical proposal, along with a price quote. The price quote must be kept separate from the technical proposal. The technical proposal must include method of accomplishment of the four numbered objectives, materials / equipment to be used, a quality control / inspection plan, and a time schedule for project completion. Evaluation and award will be made on a lowest price technically acceptable basis. Determination of technical acceptability will be based on the vendors ability to meet the four numbered objectives by 14 May 99. The Government desires the work to begin as soon after 15 Mar 99 as possible, and be complete by 14 May 99. ATTN: Lt. Frank E. Keuchel 55 CONS/LGCX 101 Washington Square Offutt AFB, NE 68113-2107 Phone: (402)294-4098 Fax: (402)294-7280 E-mail: Frank.Keuchel@offutt.af.mil Posted 01/26/99 (W-SN291582). (0026)

Loren Data Corp. http://www.ld.com (SYN# 0017 19990128\D-0003.SOL)


D - Automatic Data Processing and Telecommunication Services Index Page