|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 29,1999 PSA#2272Gila River Indian Community, Property Section, PO Box 97, 315 Casa
Blanco Road, Sacaton, Arizona 85247 B -- COMPREHENSIVE WATER RESOURCE MANAGEMENT PLAN SOL RFQ1-99 DUE
021999 POC Larry Sinclair, Project Manager or Shane Lindstrom, Water
Management Engineer, 520-562-3301, Fax 520-562-4008 WEB: click here for
the Gila River Indian Community web, http://www.gilariver.com. E-MAIL:
click here for e-mail correspondence, slindstr@gilariver.com. Request
for Qualifications. The Pima-Maricopa Irrigation Project (P-MIP) is
seeking a qualified consultant team to develop and implement a
Comprehensive Water Resource Management Plan. From the qualifications
submittals, up to five qualified teams will be invited to submit a
proposal. The P-MIP is currently under construction to eventually serve
146,330 irrigated acres on the Gila River Indian Reservation (GRIR).
The GRIR is located in Central Arizona in Maricopa and Pinal Counties,
just south of the Phoenix metropolitan area. The reservation is an
irregularly shaped area which occupies the valley of the Gila River,
extending approximately 50 miles upstream from the junction of the Salt
and Gila Rivers on the northwest to just north of Coolidge on the
southeast. General Scope of Services. The P-MIP is a multi-use system
with water supplies that include: the San Carlos Indian Irrigation
Project, the Central Arizona Project, ground water and other supplies.
The P-MIP wishes to manage available water supplies to optimize use
and maintain acceptable quality. The study may include the following
components: Data Collection and Analysis, Define Goals and Objectives,
Develop Specifications for Additional Facilities Needed and Detailed
Requirements for Additional Data Collection, Develop Water Resource
Model or Models (i.e., water balance, river basin, ground water), Water
Resources Management Plan Report. Each Statement of Qualifications
(SOQ) will be evaluated according to the following criteria: 20%
Experience and qualifications of the prime firm(including familiarity
with Reservations especially the GRIR and experience on similar
projects), 50% Experience and qualifications of the proposed specific
project team members, 10% Principal office location and work role of
local office if available, 10% Indian Preference, 10% Overall
evaluation of the teams capability to provide the required services.
Submittal Requirements. Firms interested in this project should submit
a statement of qualifications which includes a one page cover letter
plus a maximum length of eight pages to address the SOQ criteria
(excluding resumes and client list, but including an organization
chart). Resumes for each key team member shall be limited to a maximum
length of two pages and shall be attached as an appendix to the SOQ.
Please provide an original plus five copies (total of six) of the SOQ
by 12:00 noon MST on Friday, February 19, 1999. Please mark all
submittals: ATTENTION: Larry Sinclair, P-MIP Project Manager, or Shane
Lindstrom, P-MIP Water Management Engineer. Due to the confidentiality
of this work, firms that have been involved in federal, state,
municipal or tribal water rights negotiation, settlement, or
adjudication work with any adversary of Community will not be
considered. Interested firms should provide a list of projects, clients
and dates for work in Arizona for the last 20 years. Posted 01/27/99
(W-SN291882). (0027) Loren Data Corp. http://www.ld.com (SYN# 0015 19990129\B-0001.SOL)
B - Special Studies and Analyses - Not R&D Index Page
|
|